6F2S1915 (0.46)
GRZ200 (Soft 031 & 032)
- 742 -
DPOS01 function (Function ID: 512001)
Assign to BOs
Operate Cmd.
with ILK
† condition
S
R
0.1
– 50.0 s
[
DPOS01-CPW
]
Operation Cmd.
without ILK
† condition
Operate condition
‡
[
DPOS01-LGCTRCON
]
Fixedlogic
Fixedlogic
[
DPOS01-LGCFEXOT
]
DEV01_CONTROL_REQ
Command
“Remote-On-Control”
512001
_
7001016D08
ILK
†
condition (“ON”) passed
DPOS01-Close
DPOS01IN_TMP_35
512001 810301EE57
User configurable condition
(PLC#1 connection point)
“DPOS01_OEC_OK_CSF”
(512001 8003011E7F)
&
&
1
≥
&
1
≥
1
≥
&
&
&
“DPOS01_OEX_BO”
§§
(512001 8203011DD3)
Input
Output
Operate logic in DPOS01
To BO connection
“DPOS01_OEC_OK_CS”
(512001 8103011E82)
[
DPOS01-PLSM
]
*
Fix
Var
Operate Failed
[
DPOS01-RST
]
ASEQ function
§
” is in progress
ASEQ_MULTI_SEL
“DPOS01_OEC_OK_CSF”
“DPOS01_EX_FFL”
‡‡
(512001 8603011E91)
To
“Wait for a command”
&
Detection of state-change in a device
&
DPOS01IN_TMP_42
512001 820301EE5E
User configurable condition
(PLC#2 connection point)
1
≥
&
“DPOS01_EX_CMP”
(512001 8003011E93)
Operate Completed
1.0s- 100.0s
0
t
Figure 4.8-20 Operate On from the remote-end in DPOS01
††
†Note: The ILK function can provide the operation criteria for “On”.
‡Note: An “operate condition” signal is generated in the operate-condition logic (see
Figure 4.8-31), when
Fixlogic
is set for scheme switch [
DPOS01-LGCTRCON
]. If
an alternative “operate-condition” is required, it can be programmed by the user
and used to replace the signal generated by the original operate-condition logic.
The alternative “operate-condition” can be connected to the above logic using
connection point “#1” user configurable condition. That is set the scheme switch
[
DPOS01-LGCTRCON
] to
PLC
and use “DPOS01IN_TMP_35”.
§Note: The ASEQ function can provide sequential signals for automatic control.
§§Note: The “DPOS01_OEX_BO” signal is issued when
Fixedlogic
is set for scheme
switch [
DPOS01-LGCFEXOT
]. The “Operate-completed” signal can also be issued
from the logic programmed by the user in place of the logic shown in Figure
4.8-20. The user-programmed logic is connected internally to the signal “Operate
completed”, hence this signal is now generated by the user-programmed logic at
the connection point #2 “User configurable condition”. That is, set the scheme
switch [
DPOS01-LGCFEXOT
] to
PLC
and use “DPOS01IN_TMP_42”.
*Note: The user can select the type of the output signal. When
Fix
is set for scheme
switch [
DPOS01-PLSM
], the output period of the signal is defined by the setting
[
DPOS01-CPW
]. When
Var
is set, the signal ceases when the 43-switch is changed.
Summary of Contents for GR 200 Series
Page 1047: ...6F2S1915 0 46 GRZ200 Soft 031 032 1026 Figure 8 3 4 Screen shot from GR TIEMS ...
Page 1354: ...6F2S1915 0 46 GRZ200 Soft 031 032 1333 Appendix 1 Signal list for common function ...
Page 1410: ...6F2S1915 0 46 GRZ200 Soft 031 032 1389 This page is intentionally blank ...
Page 1480: ...6F2S1915 0 46 GRZ200 Soft 031 032 1459 Appendix 6 Ordering ...
Page 1497: ...6F2S1915 0 46 GRZ200 Soft 031 032 1476 Appendix 7 Technical data ...
Page 1518: ...6F2S1915 0 46 GRZ200 Soft 031 032 1497 Appendix 8 Manufacture setting ...
Page 1523: ...6F2S1915 0 46 GRZ200 Soft 031 032 1502 Appendix 10 CT requirement ...
Page 1531: ...6F2S1915 0 46 GRZ200 Soft 031 032 1510 Appendix 12 Engineering exercise ...
Page 1563: ......