154
Toshiba
12
Periodic Inspection Items
For a long-term safe operation of this equipment, perform periodic inspection and parts replacement.
<Inspection items>
Hydro unit
(HWS-802**-E, 1402**-E)
Frequency
Periodic inspection details
1. Insulation measurement (Power source circuit/ Heater
circuit)
Annually
Insulation measurement with a mega tester
2. Power source measurement (No-load voltage)
Annually
Electronic voltage measurement: 230V ±23V
3. Operation check
Annually
Hot water supply/ Heating/ Cooling operation check with
remote controller
4. Refrigerant leakage/ Water leakage inspection
Annually
Visual inspection and check with a leak tester: No leakage
must be found
5. Water heat exchanger inspection (Internal dirt and
clogging)
Annually
Checking for water dirtiness in a closed cycle, Cleaning
6. Inlet/ Outlet water temperature measurement
Annually
Temperature measurement: Temperature measurement
during an operation
7. Circulation pump inspection
Annually
No leakage or abnormal noise must be found (Replacement
every 10 years: Charged)
8. Air vent valve inspection
Annually
Water leakage, Air vent
9. Expansion vessel
Annually
Visual check for charge pressure abnormality, water
leakage, or corrosion
10. Heater assembly
Annually
Check for appearance damage, deformation, or loose
terminal
11. Flow switch
Annually
Operation check while running
12. Manometer
Annually
Water leakage, water pressure check
13. Safety valve
Annually
Water leakage, Appearance check, Drainage check
14. Water heat exchanger control board, Terminal block
Annually
Check for loose connector and connecting terminal
Outdoor unit
(HWS-802H-E, 1102H-E, 1402H-E)
Frequency
Periodic inspection details
1. Insulation measurement (Power source circuit/
Compressor)
Annually
Insulation measurement with a mega tester
2. Power source measurement (No-load voltage/ Rated
operation)
Annually
Electronic voltage measurement: 230V ±23V
3. Operation frequency (Outdoor unit operation check)
Annually
Frequency check by rated operation (See 10-13)
4. Refrigerant leakage inspection
Annually
Visual inspection and check connection with a leak tester:
No leakage must be found
5. Air heat exchanger inspection (Dirt and clogging)
Annually
Visual inspection, Clear clogging
6. Fan inspection (Scratch, damage)
Annually
Check for scratches or damages to the fan or abnormal
motor sound
7. Cycle parts
(Compressor, 4-way valve, Pulse motor valve)
Annually
Annually
Operation check by trial run
8. Inverter control board, Terminal block
Annually
Check for loose connector and connecting terminal
Hot water cylinder
(HWS-150CSHM3-E(-UK),
210CSHM3-E(-UK), 300CSHM3-E(-UK))
Frequency
Periodic inspection details
1. Insulation measurement (Power source circuit)
Annually
Insulation measurement with a mega tester
2. Power source measurement (No-load voltage)
Annually
Electronic voltage measurement: 230V ±23V
3. Water leakage inspection
Annually
Visual inspection for leakage: No leakage must be found
4. Terminal block
Annually
Check for loose connector and connecting terminal
5. Heater assembly
Annually
Check for appearance damage, deformation, or loose
terminal
6. Temperature, Pressure relief valve (Specification for
UK only)
Annually
Drainage check
+00A09-002_01EN_SVM_ALL_Air_to_Water.book Page 154 Monday, October 5, 2009 2:09 PM
Summary of Contents for ESTIA HWS-1102H-E
Page 157: ...156 220 223 235 234 222 225 226 231 232 229 228 235 233 230 221 224 227 ...
Page 167: ...166 ...
Page 168: ......