149
Toshiba
4
Electric parts
replacement
2. Reactor
1) Perform the step 1-1.
2) Remove the reactor lead connected to the control
board.
CN05 White, CN06 White
3) Cut the binding tie that binds the compressor leads
and fan motor leads.
4) Remove the reactor.
(Truss B tight screw Ø4 × 6, 2 screw)
5) Attach a new reactor.
Note)
Be sure to bind the removed binding tie by using
the commercially available binding tie.
Make sure that the fan motor lead and the reactor
body do not contact each other.
No.
Exchange parts
name
Work procedure
Remarks
Reactor lead
Reactor lead
Reactor body
Fan motor lead
Binding tie
(Compressor lead,
Reactor lead)
Binding tie
(Compressor lead,
Reactor lead)
Binding tie
(Fan motor lead,
Reactor lead)
Control board
+00A09-002_01EN_SVM_ALL_Air_to_Water.book Page 149 Monday, October 5, 2009 2:09 PM
Summary of Contents for ESTIA HWS-1102H-E
Page 157: ...156 220 223 235 234 222 225 226 231 232 229 228 235 233 230 221 224 227 ...
Page 167: ...166 ...
Page 168: ......