– 88 –
Reactors
Reactors
Partition
Partition
plate
plate
Reactor
Reactor
support board
support board
PMV coil
PMV coil
PMV coil
Reactors
Partition
plate
Reactor
support board
No.
j
k
Part name
Reactor
Procedure
1) Perform works of Detachment 1 of
c
,
d
,
e
and
f
.
2) Take off the fixing screw for the reactor.
(M4, 8 mm)
Remarks
l
1. Detachment
1) Perform works of Detachment
c
and
d
.
2) Release the coil from the concavity by
turning it, and remove coil from the PMV.
2. Attachment
1) Put the coil deep into the bottom position.
2) Fix the coil firmly by turning it to the
concavity.
1. Detachment
1) Perform works of Detachment 1 of
c
and
d
.
2) Remove the front cabinet, and put it
down so that fan guard side directs
downward.
CAUTION
Perform works on a corrugated cardboard,
cloth, etc. to prevent flaw on the product.
3) Remove the fan guard stopper.
(4 positions)
2. Attachment
1) Insert the fan guard stopper and then fix
the fan guard. (4 positions)
CAUTION
All the attaching works have completed.
Check that all the hooking claws and the
fan guard stopper are fixed to the specified
positions.
Pulse Motor
Valve (PMV) coil
Fan guard
Front cabinet
Front cabinet
Fan guard stopper
Fan guard stopper
Front cabinet
Front cabinet
Fan guard
Fan guard
Front cabinet
Fan guard
Fan guard stopper
Front cabinet
Summary of Contents for CARRIER RAV-SP180AT2-UL
Page 12: ... 12 2 CONSTRUCTION VIEWS EXTERNAL VIEWS 2 1 Outdoor Unit RAV SP180AT2 UL ...
Page 13: ... 13 RAV SP240AT2 UL ...
Page 14: ... 14 RAV SP300AT2 UL RAV SP360AT2 UL RAV SP420AT2 UL ...
Page 107: ... 107 12 EXPLODED VIEWS AND PARTS LIST 12 1 Outdoor Unit 12 1 1 RAV SP180AT2 UL ...
Page 110: ... 110 12 1 2 RAV SP240AT2 UL ...
Page 113: ... 113 12 1 3 RAV SP300AT2 UL RAV SP360AT2 UL RAV SP420AT2 UL ...