4200FA XT 80kVA Installation and Operation Manual
9
2.0 Unpacking/Inspection/Storage/Disposal
2.1
Unpacking the UPS Equipment
1) Upon receipt of the UPS, a careful inspection for shipping damage should be made.
2) For international units, remove the screws that attach the shipping crate panels to each other
and to the pallet. Remove the crate and foam packing material.
3) Unbolt the unit from the shipping pallet.
4) Lift the UPS from the pallet using a forklift that has sufficient capacity. Approach the UPS only
from the front or rear.
CAUTION
Do not attempt to move the unit by the sides. Only move the
unit with a forklift or pallet jack.
Moving the unit by pushing on
the sides may result in damage to the unit or injury to personnel.