![Toshiba 1550 Service Manual Download Page 67](http://html.mh-extra.com/html/toshiba/1550/1550_service-manual_425090067.webp)
Mar. 1998 © TOSHIBA
6 - 13
1550/1560 DRIVE
<Notes>
1. When installing the clutch, align the end face of the clutch to the shaft groove and align the hexagonal
screw to the milling cutting surface. Insert the projection of the clutch and the gear arm in the hole of
the bracket.
2. Confirm that there is no oil, etc. on the surface of the paper feed roller or the separation pad.
3. When reassembling the timing belt (removed when taking cut the pick-up roller) pass it through the
upper side of the belt tensioner.
4. When installing the separation pad bracket to the copier, first free the paper stop lever by pushing
down the pick-up roller downwards.
1:
he projection into the
ket hole
Note 1:
Put the
into the
<Illust
Al
ign with the groove
Align with the groove
Note 1:
Put the projection into the
bracket hole
Note 1:
Put the projection
into the bracket hole
Summary of Contents for 1550
Page 11: ...1550 1560 GENERAL 2 4 Mar 1998 TOSHIBA ...
Page 112: ...1550 1560 DRUM 9 12 Mar 1998 TOSHIBA 1 16 48 CLK SI1 LT OUT1 1 2 64 Timing chart ...
Page 167: ...Mar 1998 TOSHIBA 13 25 1550 1560 OPTIONAL 13 7 4 PC board assembly PWA F PFU ...
Page 188: ...Mar 1998 TOSHIBA 14 21 1550 1560 CIRCUIT DIAGRAMS Control Panel Circuit PWA F PNL 4 4 ...
Page 189: ...1550 1560 CIRCUIT DIAGRAMS 14 22 Mar 1998 TOSHIBA 14 4 Fuser Circuit PWA F FUS ...