LIFT
V
AL
VE
Sand Pro 5020
Hydraulic Schematic
LIFT
CYLINDER
Sand Pro 2020/3020/5020
Page 4 – 7
M3
M2
RIGHT
B
A
A
WITH BLEED OFF
FRONT
LEFT
M1
P1
B
P2
R2
R1
0.915
0.33
8.6
15
5.41
140.93
BARS
8.6
140.93
DISPLACEMENT
PRESSURE
COMPONENT
P1
P2
M1
M2
M3
17.1
280.22
in
/rev
cm
/rev
lbs/in
2
3
3
GPM
LPM
12.48
4.5
47.2
17
–
–
–
–
–
–
–
–
–
–
–
–
–
–
–
–
*
*
*
R1
R2
–
–
–
–
700
90
48.3
6.2
–
–
–
–
TIMED MANIFOLDS
IMPLEMENT
RELIEF
CHARGE
RELIEF
CHARGE
CHECK
CHARGE
CHECK
CHARGE
PUMP
TRACTION
PUMP
SHUTTLE
Hydraulic System (Rev. A)
OIL
COOLER
FIL
TER
RH WHEEL
MOT
OR
FOR OIL
COOLING
IN FOR
W
ARD
HYDROST
A
T
DISPLACEMENT
, FLOW RA
TE,
AND PRESSURE CHAR
T
*FLOW RA
TE
FLOW RA
TE CALCULA
TED
A
T
3150 RPM
FOR
W
ARD
FRONT
AND RH WHEEL
MOT
ORS HA
VE
REVERSE
ACCELERA
TION
V
AL
VES
T
ANK
VA
LV
E
VA
LV
E
HOT
OIL
VA
LV
E
Hydraulic Systems
Summary of Contents for Sand Pro 5020
Page 2: ...Sand Pro 2020 3020 5020 ...
Page 4: ...Sand Pro 2020 3020 5020 ...
Page 12: ...Equivalents and Conversions Product Records and Maintenance Page 2 2 Sand Pro 2020 3020 5020 ...
Page 16: ...Product Records and Maintenance Page 2 6 Sand Pro 2020 3020 5020 ...
Page 169: ......
Page 170: ...Commercial Products E The Toro Company 1998 ...