Procedure
Description
Qty.
Use
Battery terminal bolt
2
Clamp nut
2
12
Cover—wide (battery terminal—red)
1
Connect the sprayer harness to the
battery.
Bolt (1/2 x 1-1/2 inch)
2
13
Locknut (1/2 inch)
2
Lower the tank skid.
Center-boom assembly
1
Bolt (3/8 x 1 inch)
10
Flange locknut (3/8 inch)
10
Boom-transport cradle
2
Bolt (1/2 x 1-1/4 inches)
4
14
Flange nut (1/2 inch)
4
Install the boom section.
Left boom section
1
Right boom section
1
Flange-head bolts (3/8 x 1-1/4 inches)
8
Backing plates
8
Flange locknuts (3/8 inch)
8
Clevis pin
2
15
Hairpin
2
Install the left and right boom sections.
Hose clamps
3
R-clamp
2
Shoulder bolt
2
Washer
2
16
Nut
2
Install the boom hoses.
Freshwater tank
1
90° elbow (3/4 inch NPT)
1
90° spigot
1
Freshwater-tank mount
1
Mount strap
4
Flange-head bolt (5/16 x 5/8 inch)
4
Flange locknut (5/16 inch)
10
Support tube (freshwater tank)
1
Jam nut (5/16 inch)
1
Bolt (5/16 x 1 inch)
1
Shoulder bolt (1/2 x 1-15/16 inches)
2
Bolt (5/16 x 2-1/4 inches)
2
18
Washer (5/16 inch)
2
Install the freshwater tank.
Fill receptacle assembly
1
19
Flange-head bolt (5/16 x 3/4 inch)
1
Install the anti-siphon fill receptacle.
Front jack stand
2
Rear jack stand
2
Cotter pin
4
Clevis pin (4-1/2 inches)
2
Clevis pin (3 inches)
2
20
Knob
2
Store the jack stands (optional).
10