Groundsmaster 4000--D
Page 7 -- 5
Chassis
Removal (Fig. 2)
1. Park machine on a level surface, lower cutting
decks, stop engine, apply parking brake and remove
key from the ignition switch.
2. Remove front cutting deck (see Front Cutting Deck
Removal in Chapter 8 -- Cutting Decks).
CAUTION
When changing attachments, tires or perform-
ing other service, use correct jacks and sup-
ports. Make sure machine is parked on a solid,
level surface such as a concrete floor. Prior to
raising machine, remove any attachments that
may interfere with the safe and proper raising of
the machine. Always chock or block wheels. Use
jack stands to support the raised machine. If the
machine is not properly supported by jack
stands, the machine may move or fall, which
may result in personal injury.
3. Chock rear wheels and jack up front of machine.
Support machine on jack stands.
4. Remove front wheel next to lift arm that is to be re-
moved.
5. Remove cap screw, washers and lock nut that se-
cure lift cylinder pin to lift arm. Remove pin and separate
lift cylinder and lift arm.
6. Remove lock nut that secures lift arm pin. Support lift
arm and slide pin from frame and lift arm. Remove lift
arm from frame.
7. Remove height--of--cut chain, ball joint mount and
ball joint from removed lift arm as required.
Installation (Fig. 2)
1. Position lift arm to frame and insert lift arm pin. En-
gage roll pin into frame slots and install lock nut on pin.
Torque lock nut from
60 to 70 ft--lb (81 to 94 N--m)
.
2. Align lift cylinder with lift arm. Slide pin through lift
arm and cylinder end. Secure pin with cap screw, wash-
ers and lock nut.
3. Install front wheel assembly.
4. Lower machine to the ground.
5. If height--of--cut chain u--bolt was removed from lift
arm, assemble u--bolt so that threaded portion extends
0.870” (22.1 mm) above mounting plate on lift arm (Fig.
3).
6. If removed, install ball joint to lift arm. Distance from
end of lift arm to center of ball joint should be from 2.210”
to 2.390” (56.1 to 60.7 mm) (Fig. 4). Make sure that ball
joint is horizontal and that stud is centered in ball joint.
Install deck before torquing ball joint jam nut (item 24).
7. Install ball joint mount to ball joint with slotted hex nut.
Torque nut from
90 to 100 ft--lb (123 to 135 N--m)
while
aligning cotter pin holes. Install cotter pin.
8. Install front cutting deck (see Front Cutting Deck
Installation in Chapter 8 -- Cutting Decks).
9. If ball joint was removed from lift arm, torque ball joint
jam nut from
150 to 175 ft--lb (203 to 237 N--m)
.
10.Lubricate lift arm grease fittings.
11.After assembly is completed, raise and lower the cut-
ting deck to verify that hydraulic hoses and fittings do not
contact anything.
12.Check height--of--cut and deck pitch adjustment.
1. U--bolt
2. Height--of--cut chain
Figure 3
0.870”
(22.1 mm)
1
2
1. Lift arm
2. Ball joint
Figure 4
2.210” to 2.390”
(56.1 to 60.7 mm)
1
2
Chassis
Summary of Contents for Groundsmaster 4000-D
Page 2: ...Groundsmaster 4000 D This page is intentionally blank ...
Page 4: ...Groundsmaster 4000 D This page is intentionally blank ...
Page 10: ...Groundsmaster 4000 D Page 1 6 Safety This page is intentionally blank ...
Page 34: ...Groundsmaster 4000 D Page 3 18 Kubota Diesel Engine This page is intentionally blank ...
Page 212: ...Groundsmaster 4000 D Page 5 38 Electrical System This page is intentionally blank ...
Page 253: ...Groundsmaster 4000 D Page 7 11 Chassis This page is intentionally blank Chassis ...
Page 264: ...Groundsmaster 4000 D Page 7 22 Chassis This page is intentionally blank ...
Page 269: ...Groundsmaster 4000 D Cutting Decks Page 8 5 This page is intentionally blank Cutting Decks ...
Page 282: ...Groundsmaster 4000 D Foldout Drawings Page 9 2 This page is intentionally blank ...
Page 292: ...Page 9 12 Groundsmaster 4000 D Engine Wire Harness STARTER STARTER STARTER ...
Page 294: ...Page 9 14 Groundsmaster 4000 D Front Wire Harness FLOW DIVIDER SOLENOID ...