Procedure
Description
Qty.
Use
Bulkhead
1
O-ring
1
Locking ring
1
Retaining fork
2
Forward hose assembly
1
Gasket
1
Worm-screw clamp
1
R-clamp
1
Carriage bolt (5/16 x 1 inch)
1
5
Lock nut (5/16 inch)
1
Install the forward hose.
Supply hose
1
Gasket
1
Worm-screw clamp
1
Hose clamp
1
Hose adapter
1
6
Retainer pin
1
Install the supply hose.
Note:
Determine the left and right sides of the machine from the normal operating position.
1
Installing the Eductor Valve
and Hoses
Parts needed for this procedure:
1
Eductor valve assembly
2
Flange nut (1/4 inch)
1
Fitting (1 inch)
1
Retainer pins
1
Eductor valve bracket (The bracket may already be
installed from a previous kit installation)
1
Relief hose (10 3/4 inches)
1
Supply hose (18 1/2 inches)
1
Bypass hose (12 inches)
Procedure
1.
Move to the rear of the machine and locate the boom
valve assembly on the boom valve mount bracket.
2.
Remove and discard the 3 hoses shown in
but
keep the retainer pins.
Figure 3
1.
Remove and discard
3.
Secure the eductor valve bracket to the boom valve
assembly using the bolts and nuts that secure the
pressure filter to the boom valve bracket; refer to Box
A of
.
4
Summary of Contents for 41622
Page 18: ...Notes 18...