![Toro 41569 Installation Instructions Manual Download Page 4](http://html1.mh-extra.com/html/toro/41569/41569_installation-instructions-manual_1134261004.webp)
4
m–6398
1
2
Figure 5
1.
Ground wire
2.
Grounding stud
9. Route the power wire from the electrical box, behind
the saddle supports, and under the seat box to the area
under the driver’s seat.
10. Connect the power wire to the solenoid under the
driver’s seat (Fig. 6).
m–6352
1
2
Figure 6
1.
Power wire from the electrical box on the hose reel.
2.
Solenoid
Installing the Flow Control Box
Preparing the Machine
Prepare/install the mounting post as follows:
•
If you have a standard boom on your machine, drill one
hole (11/32 inch dia) in the right-side boom holder,
3-5/8 inches (9.2 cm) above the center of the lowest
hole (Fig. 7).
Note: Check the position of the right boom holder. It
should be installed as far down in the mounting slots as
possible. If it is not, loosen the mounting fasteners,
slide it down, and tighten the fasteners.
m–6353
1
3-5/8 inches (9.2 cm)
2
Figure 7
1.
Right boom holder
2.
Drill this hole,
11/32 inch dia
•
If you have the covered booms or do not have booms,
install the control box support bracket to the right rear
boom frame (Fig. 8) using existing hardware and a
flange-head bolt (1/2 x 1/2 inch) and a flange nut
(1/2 inch).
m–6354
1
4
3
2
3
5
Figure 8
1.
Control box support
bracket
2.
Right rear boom frame
3.
Existing hardware
4.
Flange-head bolt,
1/2 x 1/2 inch
5.
Flange nut, 1/2 inch