11
MACHINE PREPARATION
SOLUTION TANK
Sight gage hose released from press fitting
Solution level indicators
To prepare the machine for cleaning, the unit must be filled with cleaning solution.
1. Water and cleaning detergent can be added to the unit’s rear hose fill port located to the left of the
control panel.
2. There is also a front fill port that is able to accept hose or bucket filling.
Liquid detergent should be added to the tank in the concentration and manner specified by the
manufacturer for an eleven (11) gallon solution tank. The formation of excess foam could damage the
vacuum motor, so be sure to use only the correct amount of detergent. Water temperature should not
exceed 120°F (50°C).
1. It is easy to gauge the solution level by watching the fog-free solution sight gauge at the rear of the
machine. Additionally, marks on the tank provide solution level indicators as a guide.
2. The bottom of the front fill port is also a full level indicator. Once you are able to see water at the base of
the opening, you have reached the full level.
3. The sight gage hose performs double-duty as the solution drain hose as well. You simply slide the hose
off the press fitting and lower the hose to a drain or mop sink.
Rear hose fill port
1
Front fill port
2
4
Sight gage hose
3
Summary of Contents for Floorkeeper 28 OB/99128OB
Page 3: ...3 NOTES...