Page
16
Step 9
Torque the hardware in the following order.
•
Torque the M16 bolts to 200 ft-lbs (some installations will not
use any M16 bolts)
•
Torque the 5/8” bolts to 200 ft-lbs
•
Torque the M12 bolts to 80 ft-lbs
•
Torque the 1/2” bolts to 80 ft-lbs
Step 10
•
Hold the hole alignment plate up against the bottom of the air
dam and align it with one of the two tabs on the receiver. Use
a felt tipped pen to mark the hole location. Repeat for the
opposite side of the receiver. See Figure 10.1.
•
Drill a 1/4” hole in the two marked locations.
Figure 10.1