background image

 

 

 

 
 
 
 
 
 
3. 

Open the release hole plug on the top of the gate opener, insert the 

release key and turn the key 90° clockwise. This releases the motor and 
allows the push-pull rod to be manually extended and retracted. To 
restore normal operation, turn the key 90° counterclockwise. 

4.

 

With the opener fully retracted and with the gate in the fully open 

position (for Pull-to-Open installation)

, place the opener with the Post 

Bracket Assy. and Gate Bracket on the gate post and the gate. While 
holding the gate opener in the level position, temporarily secure it with 
two C-clamps. 

5. 

Make sure that there is a minimum clearance of 2.5cm between the gate and the opener and that the opener 

and the Pull to Open Bracket are not binding in both the gate-open and gate-closed positions. If there is not at 
least 2.5cm of clearance or if the opener and the Pull to Open Bracket are binding, rotate the Pull to Open 
Bracket and/or move the Post Bracket Assy. to obtain the minimum clearance and eliminate the binding. 

 

Summary of Contents for Casar MT8012

Page 1: ...ens com MT8012 VER 21a C030564 Please read and follow all warnings precautions and instructions before installation and use Never connect the solar panel to the control board directly to charge the ba...

Page 2: ...k Amazon de Other Please Specify Order Product Model Purchase Date Full Name Phone Email Address VERY IMPORTANT Street Address Apartment Unit City State Province Zip Code Country Region Approximate Ga...

Page 3: ...ion 7 Install the Opener on the Gate for Pull to Open 7 Install the Opener on the Gate for Push to Open 10 Mounting the Control Box 13 Connection of the Power Supply 14 Connecting of the Control Board...

Page 4: ...ould never cross the pathway of a moving gate The gate opener is not acceptable for use on any pedestrian gate Pedestrians must be supplied with a separate pedestrian access 9 For an installation util...

Page 5: ...eway gates made by steel wood vinyl and shaped as panel tube and chain link While use on solid surface gates is NOT recommended Solid surface gates have a high resistance to the wind If the wind is st...

Page 6: ...3 MT8012 Parts List Accessories Parts Included in some models refers to the actual package JD24VY 24V Warning Light TC102 Photo Eye Beam Sensor 25FT Extension 5 Conductor Cable...

Page 7: ...it Wand HLR01 HomeLink Remote Control Kit TC173 Wireless Push Button TC147 Wired Push Button ET24 Electric Gate Lock TRF3 Reflection Photocell Sensor TC102 Photo Eye Beam Sensor JD24VY 24V Warning Lig...

Page 8: ...Travel 380mm 15 in Ambient Temperature 20 50 4 F to 122 F Protection Class IP44 NOTE NR indicates this size and weight combination is NOT recommended for one arm actuator NOTE Ball bearing hinges shou...

Page 9: ...g Reverse in case of obstruction during gate closing Built in adjustable auto close 0 99 seconds Built in max Motor running time MRT adjustable for multiple safety protection 1 50 seconds Digital disp...

Page 10: ...bles are required to determine the proper mounting position for the Post Bracket The tables show the maximum opening angle of the gate for a given A and B For example if A is 18cm and B is 16cm the ma...

Page 11: ...with the Post Bracket Assy and Gate Bracket on the gate post and the gate While holding the gate opener in the level position temporarily secure it with two C clamps 5 Make sure that there is a minimu...

Page 12: ...ions 8 Attach the post bracket assemblies to the gate posts by using four expansion bolts 9 Attach the gate brackets to each gate by inserting two M8x80 bolts through the gate brackets and the drilled...

Page 13: ...ortant The following illustrations and tables are required to determine the proper mounting position for the Post Bracket The tables show the maximum opening angle of the gate for a given A and B For...

Page 14: ...for Push to Open installation place the opener with the Post Bracket Assy and Gate Bracket on the gate post and the gate While holding the gate opener in the level position temporarily secure it with...

Page 15: ...semblies and the gate bracket It allows slight adjustments to the post bracket Then remove the post bracket and gate bracket by taking off the C clamps 7 Drill 14mm diameter holes on the gate post and...

Page 16: ...is restores normal operation NOTE The setting of the PULL PUSH TO OPEN of the control board should be in accordance with the installation Mounting the Control Box Step 1 To install the control box use...

Page 17: ...t other cables into the control box through rightmost strain relief Then repeat step 2 NOTE Only motor cables 1 5m length are provided Other cables are subject to site installation requirement and not...

Page 18: ...15 Connecting of the Control Board...

Page 19: ...e is no solar panel to be used for charging the battery then the 24V of the battery should be wired to the BAT 13 terminal 24V should be wired to BAT 14 terminal The battery could also be charged by t...

Page 20: ...OWN wire of the external receiver should be connected into the 19 terminal The BLACK wire of the external receiver should be connected into the 20 terminal The RED wire of the external receiver should...

Page 21: ...e to only operate TOPENS swing gate opener A B C and D four buttons share same function once they are programmed with TOPENS swing gate opener You may choose any button to program it with our swing ga...

Page 22: ...ensure successful programming Setting of the Control Board WARNING Ensure the gate opener is Power Off when you make any adjustment of the gate opener Keep away from the path of the gate during you se...

Page 23: ...tween Master Slave Gate Setting The open interval can be adjusted by pressing the INC and DEC Buttons respectively The Digital Display will show 0 9 which indicates the interval time 0 means the Maste...

Page 24: ...MOTOR1 is adjusted by pressing INC and DEC buttons respectively The Digital Display will show 01 50 which indicates the MRT of MOTOR1 from 1 to 50 seconds You can hold pressing the INC or DEC button...

Page 25: ...eriod STP is set at 3 sec and the GRP is 23 sec you can calculate the GRP period by yourself from the arm actuator starting to move on the fully open position to the arm arriving at the fully close po...

Page 26: ...y a silicone spray to reduce its friction In cold climates where temperatures reach 1 C 30 F or less spray silicone on the actuator every 4 6 weeks to prevent freeze up 2 Regularly check gate hinges t...

Page 27: ...n cold weather as the gate will not move freely 3 Check if the MRT period is too short Gate opens but does not close 1 Photocell PBS function is enabled in control board setting but is not equipped op...

Page 28: ...25 Quick Setting Guide...

Page 29: ...26...

Page 30: ...27...

Page 31: ...28...

Page 32: ...any need to contact us the info below will help you get in touch TOPENS Website www topens com Contact Us E mail support topens com Kindly include your Product Model Purchasing Date Site Order and yo...

Reviews: