14
Step 8
Firmly secure the gate opener assembly to the post and gate.
Mounting the Control Box
Step 1
To install the control box use the deck screws (not provided).
Even though the control box is waterproof designed, for safety reason and
a longer service life, it is recommended to install the control box inside a
secure surface and at least 100 cm (40 inches) above the ground to avoid
being flooded or buried under snow.
Step 2
Insert the power cable and cable of the first gate opener through the front strain relief
and into the control box by loosening the strain relief screw located in the leftmost of
outside bottom of the control box and feeding the cables into the control box. Check
the length of cables is long enough to their respective terminal block in control box.
Retighten the sealing nut so that cables are well locked.
NOTE: The setting of the PULL/PUSH TO OPEN of the control board should be in accordance
with the installation.
Summary of Contents for CASAR HJ4021
Page 6: ...3 Installation Overview Dual Gate Opener Parts List HJ4022...
Page 19: ...16...
Page 29: ...26 Quick Setting Guide...
Page 30: ...27...
Page 31: ...28...
Page 32: ...29...