Page 14 of 39
5.1.2 Switching on the device / Ready for operation
1
Set the
unit switch [E1]
on the rear panel to "1
ON". The system starts automatically and
switches off after reaching the set temperature
and pressure.
The system is ready for
operation after approx. 5 minutes
.
Note
: For initial commissioning, the process may
take 1-2 minutes longer.
2
Turn the
middle rotary knob [I]
90° clockwise to
"PUR".
3
Place the glass under the
tap [D]
and pull the
handle [D1]
forward by 90°. The appliance
sucks in the liquid and after a short time it flows
out of the tap in a cooled manner.
To stop the tapping process, flip the tap handle
upwards again.
4
As soon as the liquid flows, turn the
middle knob
[I]
90° counterclockwise to "NITRO".
Now the NITRO settings can be made to adjust
the foaming.
More information under "5.1.3 Adjusting the
foaming with NITRO EASY CONTROL".
E1
D1
11
I
I
D