background image

 

W W W . T M G I N D U S T R I A L . C O M                 P 6 / 1 7               To l l   F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9  

 

Installation steps 

 

Step 1 : Review the whole structure and choose the proper installation site 

 

Choose a solid level ground area to set up the building. Do not install in an area 
where the floor is soft, a wetland, can not take the weight, or keep the building steady. 

 

We strongly recommend to install the building on a concrete foundation with all 
expansion bolts to secure all baseplates. Do not use any anchor spikes! 

 

Watch the surroundings! Do not set up the building near any snowdrifts. The fabric 
cover can hold up a certain amount of falling leaves, light debris and wind resistance, 
however, large, fast or sharp falling items and big wind might punch or tear the fabric 
materials. Keep the building surroundings clear to avoid potential damages. 

 

Be careful with power and heat sources. Do not keep heat sources near the cover. Do 
not expose the building to open flame. 

 

 

Review the whole frame structure diagram as shown in figure 1, decide the 
roll up door position, and make sure you will have about 3 ft clearance around 
the building. 

 

 

Draw a rectangular square base line showing all positions of base plates and 
front and rear doors. The diagonal X and Y must be equal. ( Refer to figure1) 

 

 

Baseplates : all baseplates must be bolted firmly with expansion bolts(#7B). It 
is concrete expansion bolt. 

 

 

Baseplate installation is as below and all baseplates are required to install and 
tie firmed on this step. (refer to figure 1)

   

 

 

-

 

(4) Baseplates (#5L, #5R) 

-

 

(18) Baseplates (#7) 

-

 

(4) Baseplates (#6L, #6R) 

-

 

(96) Expansion bolts (#7B) 

Figure 1 

Summary of Contents for TMG-DT3080-PRO

Page 1: ...W W W T M G I N D U S T R I A L C O M P 0 1 7 To l l F r e e 1 8 7 7 7 6 1 2 8 1 9...

Page 2: ...nd safety operation Check all components and parts before installation All parts are marked with a part number please refer to the parts list to ensure you have all parts Choose a day with low or no w...

Page 3: ...trusses 18 A 2A Upper rafter tube for front and rear truss 4 A 3 Shoulder tube for middle trusses 18 B 3A Shoulder tube front and rear trusses 4 B 4 Sidewall tube middle trusses 18 A 4A Sidewall tube...

Page 4: ...ront and rear truss 2 B 9L Front and rear vertical door rail left side upper part 2 B 9R Front and rear vertical door rail right side upper part 2 B 9A Side door left tube 2 B 9B Side door right tube...

Page 5: ...Sidewall frame steel tension cables 24 B 18 Ridge steel tension cables front and rear trusses 24 B 19 Middle truss crossing steel tension cables 9 B 20 Front and rear truss left and right steel cable...

Page 6: ...and nuts 99 B 29 Strengthened bolt M12x30mm and nuts 220 B 30 Hex bolt M10x50mm and nuts 14 B 31 Hex bolt M10x70mm and nuts 68 B 32 Braided rope tie to front and back doors 1 bundle B 33 Roof fabric...

Page 7: ...sharp falling items and big wind might punch or tear the fabric materials Keep the building surroundings clear to avoid potential damages Be careful with power and heat sources Do not keep heat source...

Page 8: ...c panel 34 and roll up door 35 Parts used to install the front truss and rear truss in this step refer to figure 2 1x2 Peak arch tube 1A 2x2 Upper rafter tube 2A 2x2 Shoulder tube 3A 1x2 Sidewall tube...

Page 9: ...gure 4 4 Scratch resistant tape 38 Figure 4 Step 3 Put up the front truss Put up the front truss use a crane is the best and safest way otherwise pull with ropes is another option but you have to make...

Page 10: ...Step 4 Put up the rest trusses Refer to step 3 to put up the rest trusses connect all purlins 5 with bolt 28 and secure all bolts firmly on each span before going to next truss Parts used in this ste...

Page 11: ...mpletely up refer to figure 7 Parts used in this step 81 Roof purlin 5 81 Self locking bolt 28 72 Strengthened bolt 29 Figure 7 Tension cable installation All cables are diagonally installed on each s...

Page 12: ...time to secure all bolts and nuts firmed on the structure But do not over tight the bolts otherwise the tubes might be damaged Step 5 Front and rear trusses to complete Install all other tubes on the...

Page 13: ...oors 23B 1x2 Left pulley system for front and rear doors 23C 2x2 Front and rear vertical door rail connection plate 24 2x2 Front and rear vertical door rail end plate 24A 4x2 Tension tube end water pl...

Page 14: ...l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Figure 10 Install the front door pressing plate Trim the side door tarp the front and rear mounting methods are the same refer to figure 11 6x2 Pressing plate 22A 1x2...

Page 15: ...le B from the winch to run through the lower roller of the dual pulley 23B go straight down at the left side reach to the left end of dropping tube 15 Tie the cable to the end hole Connect cable 23A t...

Page 16: ...when you are ready to install the roof cover unpack the cover and position it parallel to the building frame on one side The cover must be pulled over the top of the truss frame without being snagged...

Page 17: ...t tube also to keep water away Stretch and adjust the cover from left and right back and forth to make sure it is square and centered Cut the grooves from inner side facing to the ratchet hardware 7A...

Page 18: ...still firmly secured and the whole building is well supported Check all bolts and nuts as well as all connection points to make sure they are all in good position Check the base plates adjust the rop...

Reviews: