W W W . T M G I N D U S T R I A L . C O M P 1 2 / 1 7 To l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
-
(3x2) Door frame horizontal tube (#11)
-
(1x2) Side door upper tube (#11C)
-
(1x2) Bottom tension bar (#12)
-
(1x2) Bottom tension bar (#12B)
-
(1x2) Front and rear door hand winch crossing tube (#13)
-
(2x2) Front and rear truss left and right steel cables (#20)
-
(1x2) Right pulley system for front and rear doors (#23B)
-
(1x2) Left pulley system for front and rear doors (#23C)
-
(2x2) Front and rear vertical door rail connection plate (#24)
-
(2x2) Front and rear vertical door rail end plate (#24A)
-
(4x2)Tension tube end water plug (#25)
-
(3x2) Tube clamps (#26)
-
(7x2) Hex bolt (#30)
-
(32x2) Hex bolt (#31)
-
(8x2) Tapping screw (#39)
Figure 9
Step 6 : Install front and rear cover panels
Lift up (#34) cover panels, starting from the center point of the frame (highest
ridge point) use ropes (#32) through the grommets to tie the panel to the truss
firmly. All grommets need to be tied to the frame as shown in figure 10.