background image

Thank you and congratulations on the purchase of your Shire Garden Building. We believe that this 

product will give you many years of excellent service. This is a natural product manufactured to a high 

standard therefore if you have any queries or experience any difficulties then please contact our 

customer service hotline on 

01945 46 89 10 

or 

01945 46 89 11 

or

 01945 46 89 12

. Normal office hours: 

8.30am to 5.00pm Monday to Friday. Answer phone all other times.    

Preparation of Base

We recommend that the base onto which your building will stand should be at least 75mm larger in 
each direction than the total floor size of the building. 
Actual floor area of the building: 1250 x 1250mm
Total height clearance: 2500mm
The chosen position in your garden for the siting of the building should be excavated to a depth of 75mm 

to allow a base of sand, on to which paving slabs can be evenly laid - 

THEY MUST BE LEVEL AND 

FIRM.

Treatment/Care of your Garden Building

Tools Required

Posidrive screwdriver (electric is best)
Drill, 6mm drill bit 
Sandpaper (to smooth any rough edges)

Tape measure
Step ladder
Pencil

IMPORTANT!

PLEASE READ PRIOR TO ASSEMBLY OF THE BUILDING

WE RECOMMEND THAT PROTECTIVE GLOVES

 BE WORN THROUGHOUT

Wood is a natural product and is therefore prone 
to changes in appearance, including some 
warping, movement and splitting, particularly 
during unusual climatic conditions (long hot or 
wet spells of weather). As a natural occurrence
 this is not covered by a guarantee.

PLEASE NOTE

BUILT AROUND OUR REPUTATION

©

Treat with a suitable decorative wood finish immediately.  We recommend that all timber pieces be 
treated again prior to assembly and again within 3 months of assembly.  We further recommend that 
all pieces are treated again at least annually or as frequently as the instructions on the product used 
recommends.

We would suggest that all wall panels be treated in an upside-down position to allow the finish/treatment 
to ingress into the tongue and groove jointing.

We would also remind you that you would rarely (if ever) be able to re-treat the underside of the floor 

following assembly.  We strongly recommend that the underside of the floor is treated an absolute 

minimum of twice (not including pre-treatment).

Garden buildings are not waterproof, therefore on assembling building we recommend using a 
silicon based sealant between wall panels and between wall panels and floor.

EXPLODED VIEW OF PANELS 

Assembly of 

Corner Arbour

EVERY PRECAUTION IS TAKEN TO ENSURE THAT YOUR 
BUILDING HAS NO ELEMENT INCORRECTLY PLACED OR POS-
SIBLY HAZARDOUS, HOWEVER PRIOR TO USE PLEASE 
CHECK ALL SURFACES FOR THE FOLLOWING:

1 RAISED GRAIN, SPLINTERS: sand down timber to smooth finish.
2 NAIL/SCREW/PIN HEADS PROUD: tap home to be flush with 
surface of timber.
3 DAMAGED SCREW HEADS: RESULTING IN SHARP SPLIN-
TERS OF METAL: replace.
4 SHARP ENDS OF NAILS/ SCREWS/PINS PROTRUDING 
THROUGH THE PANEL: remove and reposition.
5 ENSURE ALL PARTS ARE SECURED AGAINST REASONABLE 
FORCE: remove  and refit.
6 ENSURE THERE ARE NO LOOSE PARTS: remove and 
refit/discard.

01/03/10

Parts List

QTY DESCRIPTION

2 Back Panels - 1583 x 1118 mm 

A

2  Side Panels - 1583 x 408 mm 

  B 

5 Corner Posts - 65 x 65 mm (Bevelled) 

1 Seat Panel Support - 34x34x1118 mm 

  D

1 Seat Panel Support - 34x34x1084 mm 

  E

2 Seat Panel Supports - 34x34x420 mm 

  F

SeatPanel    G

1 Seat Facia - 653mm Long                                 H
1 Seat Facia - 645mm Long 

 

I

1 Roof Bearer Centre Piece - 34x34x165 

  J

4 Roof Bearers 

K

4 Roof Braces 

L

1 Roof Finial 

4 Roof Panels 

N

1 Seat Back - Left Hand 

  O

1 Seat Back - Right Hand 

  P

PLEASE LAY OUT PARTS AND CHECK OFF AGAINST 

CHECK LIST BELOW:

90 x 60 mm Screws

6 x 25 mm Screws

8 x 50 mm Screws

1  Double Ended Screw

NOTE: ASSEMBLY INSTRUCTIONS SHOW PANEL `A`  WITH 

SHIPLAP BOARDING. ACTUAL PANELS ARE  BOARDED WITH

 TONGUE AND GROOVED MATCHING.  

Reviews: