![TMG A1-DBS Instruction Manual Download Page 8](http://html1.mh-extra.com/html/tmg/a1-dbs/a1-dbs_instruction-manual_1121808008.webp)
8
3
Installation
The instruction manual is part of the delivery.
Study the instructions carefully.
3.1. Unpacking / intermediate storage
Check the delivery for:
1.
Complete valve
2.
Instruction manual
3.
Valve for damage
4.
Delivery note
Step 1
Remove packaging material
Use the right tools to remove staples and / or straps.
Step 2
Please note weight of the valve
Carefully lift the valve out of the package, use lifting equipment if necessary.
Step 3
Remove possible packing materials from the valve ports.
Step 4
Inspect the valve for any transport damage.
3.2. Disassembly
The valve is assembled complete.
When the body of the valve is equipped with welding
connections, the valve will have to be disassembled first.
Please observe the following steps.
Place the valve vertically and remove the Try-clamp
Never weld the Valve Body with an Actuator mounted
Carefully lift the actuator with the Cone and Bellows (CBS).
Be careful not to damage O-ring and Bellows.
Place the Actuator with CBS in a safe place.
The Body can now be mounted in pipework.
Summary of Contents for A1-DBS
Page 1: ...1 Instruction manual AR MA 002 E01...
Page 5: ...5 1 2 Coding of Valves...