172-65608MA-03 (RGDS) 5 Oct 2021
14
Replacement Timing for Consumables
Refer to the following table as a guide for the timing to replace consumable parts.
Part
Replacement Timing
Pump
Mechanical seal
When liquid leakage is observed or after 8000 hours
operation
Shaft, bearings
Every 2 to 3 years
Gaskets
When liquid leakage is observed or when disassembling
Refer to individual instruction manuals for other maintenance and inspection procedures.