Tivok Energy T-HP20AB Heat Pump Installation Manual
8
WIRED CONTROLLER INSTALLATION
WALL-MOUNTED
INSTALLATION
The controller is originally fixed onto the maintenance door
of the heat pump, only refer to the following steps if you
wish to mount the controller on a wall.
1. Take down the controller from the machine. The
communication wire is connected with the circuit
board; separate them from where they match.
2. Use a screwdriver to open the clip as picture 1,
separate the controller into 2 parts, as picture 2.
3. On the wall that you are going to install the controller,
drill 2 holes at a level parallel to the sight line as
picture 3. The hole distance is 60mm, diameter is
8mm.
4. Place the plastic screws of the enclosure into the
hole, and use the tapping screw (ST4*16 D-1)
enclosed to fix the back cover of controller on the
wall, as picture 4.
5. Match the front and back covers perfectly, as picture
5, make sure that it is fixed firmly on the wall.
6. Connect the communication wire well.
j
pbq
1
60mm
8
3
Summary of Contents for T-HP20AB
Page 1: ...Installation and Operation Manual Tivok Energy Heat Pump T HP20AB...
Page 21: ...19 Tivok Energy T HP20AB Heat Pump Installation Manual CIRCUIT DRAWING MODEL T HP0AB...
Page 25: ...23 Tivok Energy T HP20AB Heat Pump Installation Manual CIRCUIT DRAWING MODEL T HP20AB...
Page 32: ...Tivok Energy T HP20AB Heat Pump Installation Manual 30 NOTES...
Page 33: ...31 Tivok Energy T HP20AB Heat Pump Installation Manual NOTES...