8.
Precommissioning
Precommissioning, equipment adjustment, troubleshooting to be performed only by the properly
qualified professionals!
It is necessary to comply with safety regulations during precommissioning and equipment
adjustment!
ATTENTION!
Before using the product, make sure that all safety components are in order and correctly installed.
Please note that the product may have been damaged during transportation.
Do not disconnect safety components or try to modify them.
In case of any malfunction or defect, notify the service manager.
8.3 Controlling the operation of boom barrier
The boom barrier can be controlled using manual control, remote control (button, switch) or ACS controller.
These devices can be connected to boom barrier separately, all together (in parallel) or in any combination
with each other
.
Command
Operator
actions
Command on
control panel
Boom barrier
condition
Passage condition
-
-
-
Forbidden /
boom barrier closed
Open the
passage
Press the button
"UP"
The boom barrier will
rise to the upper
position and stop.
Permitted /
boom barrier open
Stop the
movement of
boom barrier
Press the button
"STOP”
Stop and will be in static
position until new
commands are given
Forbidden /
boom barrier
partially closed
Close the
passage
Press the button
"DOWN”
The boom barrier will
rise to the lowest
position and stop.
Forbidden/
boom barrier closed
Table 6
-
Boom barrier operation using wired control panel
8.1 Preparation for precommissioning:
џ
Compliance and reliability of boom barrier electrical cable connections and control unit to be
checked;
џ
The roadbed around boom barrier to be restored;
џ
The equipment power network to be checked;
џ
Reliability of connection with earth loop to be checked.
8.2 Precommissioning:
џ
Gear motor and control unit to be energized;
џ
Boom barrier trial operation to be conducted;
During the trial cycle, check the operating parameters of gear motor, unit controls, remote controls
and
general operation of boom barrier.
If necessary, adjust the required parameters of the equipment.
After a test run and check, the cable glands to be carefully clamped to prevent from water entering!
In case of malfunction that cannot be eliminated using the information in this Manual, you must
contact the service department.
Page
-20-
Size А4
Installation and Operation Manual
Revision 1.0 2021
ROAD BLOCKING SYSTEMS
Office and Production site:
Tel.:
+380 (44) 291-21-11
14 Promyslova str., 02088, Kyiv, Ukraine,
Fax:
+380 (44) 291-21-02
E-mail:
[email protected] www.tiso.global
BOOM BARRIER OPTIMUS