6.
Installation of boom barrier
Left version boom barrier
Right version boom barrier
cabinet door
cabinet door
џ
Arrangement of installation site must comply with requirements of the applicable regulations and
standards.
џ
Installation area shall be fenced along perimeter with temporary security fencing or caution tape
at the distance of 3 meters from the installation site.
џ
The appropriate warning signs ISO 7010:2011 shall be installed in front of the installation site.
џ
Keep outsiders away from the installation site!
џ
Safety regulations must be observed during installation!
6.1 Preliminary check
Make sure that the following conditions are met to ensure safe and reliable operation of the Boom
Barrier:
џ
The installation site soil should provide high stability of the base plate.
џ
The boom should not be in contact with foreign objects (e.g. tree branches) along the entire move-
ment and should move at least 2 m apart overhead power transmission lines.
џ
Make sure that there are no underground utilities at the installation site!
џ
No underground pipes and/or cables to be available within the excavation area for the base plate
installation.
џ
If there is a risk of damage of the Boom Barrier body by passing vehicles, then the required precau-
tionary measures to be taken, if applicable, to protect it from impacts.
џ
The Boom Barrier rack to be securely grounded to ensure electrical safety.
џ
The Boom Barrier installation requires preliminary pulling of electric cables and, if necessary, laying
of the base plate.
- if the cabinet is on the right, it is a right version of boom-barrier.
Prior to installation make sure of availability
of all necessary tools and materials, ensuring the
system installation in full accordance with the
applicable safety regulations.
Note to boom barrier installation:
The barrier may be used exclusively for the passage of vehicles. Pedestrians shall not pass under
a moving arm. A passage suitable for pedestrians should be provided. This passage shall be indicated
by a special sign;
The cabinet door shall be located on the inside of the territory. If you are in the centre of the pas-
sageway, turn towards the outside:
- if the cabinet is on the left, it means it is a left version of boom-barrier,
6.2 Tools
The minimum kit of the required installation
tools is shown in Figure below.
Page
-11-
Size А4
Installation and Operation Manual
Revision 1.0 2021
ROAD BLOCKING SYSTEMS
Office and Production site:
Tel.:
+380 (44) 291-21-11
14 Promyslova str., 02088, Kyiv, Ukraine,
Fax:
+380 (44) 291-21-02
E-mail:
[email protected] www.tiso.global
BOOM BARRIER OPTIMUS