Installation Methods
1. Caster installation method: Take the machine body, caster axis, caster and screws of the
packaging case, and incline the machine body. As shown in Fig. 1, fix the caster axis on the
machine body with 4 screws in counter-position, and fix the caster at both sides of the axis also in
counter-position. Upon end of the fixing, put the body upright.
2. Upper steel pipe installation method: As shown in Fig. 2, screw down the two screws at top of
the body, turn the upper steel pipe by 180 degree, and fix the upper steel pipe with the screws in
counter-position.
*Tip: Upon end of installation, keep the machine out of any action for 2h before starting to
use.
(Fig. 1)
Caster
Caster Axis
Screw
Summary of Contents for 102611934
Page 31: ... Fig 2 Screw Upper Steel Pipe Pedal ...
Page 37: ...Precautions for Use ...