14 |
P a g e
Tigo Energy, Inc.
|
www.tigoenergy.com
|
Installation
Caution
For personal safety always wear appropriate PPE and use all safety precautions
suitable for the working environment, including the use of insulated tools.
Note:
All electrical installations must be completed in accordance with all local
electrical codes and the National Electric Code, NFPA 70 (NEC). For installation
in Canada the installations must be completed in accordance with applicable
Canadian standards. Before connecting the inverter to the power distribution
grid, contact your local electric utility company. These connections may only be
made by qualified personnel.
Mounting the EI Battery
Tools needed: Electric drill, 8mm bit hammer/mallet, level, pencil, socket wrench
Accessory parts needed: Sleeve anchors (
C
)
Warning!
Before drilling into the wall, inspect for existing electrical or plumbing installations
to avoid electric shock or other injuries.
Note
The instructions below are for securing the enclosure to drywall. If another surface
is used, use the appropriate hardware to securely mount the battery enclosure.
1)
Before positioning the EI Battery in place, identify the
mounting tabs
(
14
) on the back of the enclosure. Place
the EI Battery and rotate the mounting tabs 90º to the
outside.
2)
Mark holes through the mounting tabs for
drilling. Drill 2in (5cm) deep holes with an
8mm bit.
Figure 10
Mounting tabs
Figure 11
Mounting
preparation