OPERATION
Boom
Operation Section 3-11
©2013 Alamo Group Inc.
OPERA
TION
6.2 Boom Unit Pre-Operation Inspection and Service
Inspect and service the boom arm and head prior to operation. Damaged and/or broken parts should be
repaired and/or replaced immediately. To ensure the unit is ready for operation, conduct the following:
OPS-B- 0020
FRAME ASSEMBLY
•
Inspect condition of mounting frame weldment.
•
Inspect condition of Swivel Assy.
•
Ensure all bolts and screws are in position and
are properly torqued.
•
Ensure all pins are in place and fastened with
screws.
•
Ensure frame is properly mounted to tractor
and hardware is propely installed and
tightened.
OPS-B- 0021_D
Periodically inspect all moving parts for wear and replace when
necessary with authorized service parts. Look for loose fasteners, worn
or broken parts, and leaky or loose fittings. Make sure all pins have
attaching hardware. Serious injury may occur from not maintaining this
machine in good working order.
(SG-21_A)
The operator’s manual and safety signs affixed on
the unit contain important instructions on the safe
and proper use of the equipment. Maintain these
important safety features on the implement in good
condition to ensure the information is available to
the operator at all times.
•
Ensure all safety signs are in place and legible.
Replace missing, damaged, and illegible
decals.
OPS-U- 0011_A
Turret Frame Assy.
Summary of Contents for BENGAL JD6110-20M/R MY20
Page 4: ......
Page 6: ......
Page 7: ...Safety Section 1 1 2015 Alamo Group Inc SAFETY SECTION...
Page 25: ...SAFETY BOOM Safety Section 1 19 2015 Alamo Group Inc SAFETY...
Page 26: ...SAFETY BOOM Safety Section 1 20 2015 Alamo Group Inc SAFETY...
Page 27: ...SAFETY BOOM Safety Section 1 21 2015 Alamo Group Inc SAFETY...
Page 28: ...SAFETY BOOM Safety Section 1 22 2015 Alamo Group Inc SAFETY...
Page 29: ...SAFETY BOOM Safety Section 1 23 2015 Alamo Group Inc SAFETY...
Page 31: ...Assembly Section 2 1 ASSEMBLY SECTION JD6110 20 M R MY20 BENGAL BRUTE...
Page 48: ...ASSEMBLY Assembly Section 2 18 BOOM JOYSTICK DIAGRAM ASM C 0082A...
Page 57: ...Operation Section 3 1 2013 Alamo Group Inc OPERATION SECTION...
Page 102: ...OPERATION Boom Operation Section 3 46 2013 Alamo Group Inc OPERATION...
Page 103: ...Maintenance Section 4 1 2020 Alamo Group Inc MAINTENANCE SECTION...
Page 110: ...MAINTENANCE Boom Maintenance Section 4 8 2020 Alamo Group Inc MAINTENANCE...
Page 132: ...MAINTENANCE Boom Maintenance Section 4 30 2020 Alamo Group Inc MAINTENANCE...
Page 134: ...MAINTENANCE Boom Maintenance Section 4 32 2020 Alamo Group Inc MAINTENANCE...
Page 135: ...PARTS SECTION JD61xxM R MY20 BENGAL BRUTE w BUMPER TANK...
Page 142: ...BOOM MOUNT 2021 Alamo Group Inc Parts Section 8 JD6110 20 M R MY20 BENGAL BRUTE w BUMPER TANK...
Page 155: ...COMMON LEGAL REAR STOW T4 PARTS SECTION Common Section 6 1...
Page 158: ...PARTS ORDERING GUIDE 2015 Alamo Group Inc Common Parts Section 4 COMMON LEGAL REAR STOW T4...
Page 162: ...BENGAL BRUTE BOOM HOSES 2015 Alamo Group Inc Common Parts Section 8 COMMON LEGAL REAR STOW T4...
Page 164: ...BOOMREST 2015 Alamo Group Inc Common Parts Section 10 COMMON LEGAL REAR STOW T4...
Page 198: ...FRONT HYDRAULIC PUMP 2015 Alamo Group Inc Common Parts Section 44 COMMON LEGAL REAR STOW T4...
Page 202: ...FLAIL MOTOR BREAKDOWN 2015 Alamo Group Inc Common Parts Section 48 COMMON LEGAL REAR STOW T4...
Page 215: ...TROUBLESHOOTING 2015 Alamo Group Inc Common Parts Section 61 COMMON LEGAL REAR STOW T4...
Page 217: ...NOTES 2015 Alamo Group Inc Common Parts Section 63 COMMON LEGAL REAR STOW T4...
Page 218: ...WARRANTY SECTION Warranty Section 7 1...
Page 219: ......
Page 223: ...Printed in USA Tiger Corporation...