MAINTENANCE
Boom
Maintenance Section 4-29
©2020 Alamo Group Inc.
MAINTENANCE
CUTTERSHAFT BEARING REPLACEMENT
1.
Remove existing cuttershaft, bearings and string guards.
2.
Make sure that the end knives on each end of the cuttershaft are oriented as shown.
3.
Apply anti-seize on cuttershaft as shown on next page.
4.
Install non-drive side bearing first.
5.
Install the top of the string guard on the non-drive side first. Use Loctite 271 or equvalent and
torque (95 ft-lb or 104ft-lb if you use an extension).
6.
Install the bearing and top string guard on the drive side.
7.
Center the cuttershaft between the string guards. Use Loctite 271 or equivalent and torque
(95ft-lb or 104ft-lb if you use an extension) the top string guard on the drive side.
8.
Install, use Loctite 271 or equivalent, and torque (95ft-lb or 104ft-lb if you use an extension)
the bottom string guard on both sides.
9.
Make sure the cuttershaft is centered. On the non-drive side, tighten one set screw in the bearing onto
the cuttershaft.
10.
Remove the other set screw and drill a 5/16” hole into the cuttershaft 3/16” deep through the hole in the
bearing. BE CAREFUL NOT TO DAMAGE THE THREADS IN THE BEARING HOLE.
11.
Replace the set screw in the bearing, use Loctite 271 or equivalent, and tighten onto the cuttershaft
through the new hole.
12.
Remove the other set screw and repeat the drilling procedure (Step 10). Replace the set screw as
stated in Step 11.
13.
Repeat steps 9 through 12 on the drive side.
14.
Grease both bearings properly.
See illustration on next page
Summary of Contents for BENGAL JD6110-20M/R MY20
Page 4: ......
Page 6: ......
Page 7: ...Safety Section 1 1 2015 Alamo Group Inc SAFETY SECTION...
Page 25: ...SAFETY BOOM Safety Section 1 19 2015 Alamo Group Inc SAFETY...
Page 26: ...SAFETY BOOM Safety Section 1 20 2015 Alamo Group Inc SAFETY...
Page 27: ...SAFETY BOOM Safety Section 1 21 2015 Alamo Group Inc SAFETY...
Page 28: ...SAFETY BOOM Safety Section 1 22 2015 Alamo Group Inc SAFETY...
Page 29: ...SAFETY BOOM Safety Section 1 23 2015 Alamo Group Inc SAFETY...
Page 31: ...Assembly Section 2 1 ASSEMBLY SECTION JD6110 20 M R MY20 BENGAL BRUTE...
Page 48: ...ASSEMBLY Assembly Section 2 18 BOOM JOYSTICK DIAGRAM ASM C 0082A...
Page 57: ...Operation Section 3 1 2013 Alamo Group Inc OPERATION SECTION...
Page 102: ...OPERATION Boom Operation Section 3 46 2013 Alamo Group Inc OPERATION...
Page 103: ...Maintenance Section 4 1 2020 Alamo Group Inc MAINTENANCE SECTION...
Page 110: ...MAINTENANCE Boom Maintenance Section 4 8 2020 Alamo Group Inc MAINTENANCE...
Page 132: ...MAINTENANCE Boom Maintenance Section 4 30 2020 Alamo Group Inc MAINTENANCE...
Page 134: ...MAINTENANCE Boom Maintenance Section 4 32 2020 Alamo Group Inc MAINTENANCE...
Page 135: ...PARTS SECTION JD61xxM R MY20 BENGAL BRUTE w BUMPER TANK...
Page 142: ...BOOM MOUNT 2021 Alamo Group Inc Parts Section 8 JD6110 20 M R MY20 BENGAL BRUTE w BUMPER TANK...
Page 155: ...COMMON LEGAL REAR STOW T4 PARTS SECTION Common Section 6 1...
Page 158: ...PARTS ORDERING GUIDE 2015 Alamo Group Inc Common Parts Section 4 COMMON LEGAL REAR STOW T4...
Page 162: ...BENGAL BRUTE BOOM HOSES 2015 Alamo Group Inc Common Parts Section 8 COMMON LEGAL REAR STOW T4...
Page 164: ...BOOMREST 2015 Alamo Group Inc Common Parts Section 10 COMMON LEGAL REAR STOW T4...
Page 198: ...FRONT HYDRAULIC PUMP 2015 Alamo Group Inc Common Parts Section 44 COMMON LEGAL REAR STOW T4...
Page 202: ...FLAIL MOTOR BREAKDOWN 2015 Alamo Group Inc Common Parts Section 48 COMMON LEGAL REAR STOW T4...
Page 215: ...TROUBLESHOOTING 2015 Alamo Group Inc Common Parts Section 61 COMMON LEGAL REAR STOW T4...
Page 217: ...NOTES 2015 Alamo Group Inc Common Parts Section 63 COMMON LEGAL REAR STOW T4...
Page 218: ...WARRANTY SECTION Warranty Section 7 1...
Page 219: ......
Page 223: ...Printed in USA Tiger Corporation...