ASSEMBLY
Assembly Section 2-17
BOOM JOYSTICK CONTROL CALIBRATION (
CONTINUED
)
MAIN BOOM:
“A” Port, Boom Up:
8-10 Seconds
(Note: Extend secondary boom completely; roll deck to be level with ground, and lower main
boom until deck is on ground. Now index main boom “up” function and determine the time
required for main boom to rise completely.)
“B” Port, Boom Down:
6-8 Seconds
(Note: Extend secondary boom completely, roll deck to be level with ground, and raise the main
boom to “full up”. Then index the main boom “down” function to determine the amount of time
required for the deck to contact the ground. CAUTION: Stop the boom just as the deck contacts
the ground.)
SECONDARY
BOOM
:
“A” Port, Boom Out:
8-10 Seconds
(Position main boom full up, roll deck out until deck cylinder is fully retracted, and bring
secondary boom in completely. Then index the secondary boom “out” function and determine the
time required for boom to extend out completely.)
“B” Port, Boom In:
8-10 Seconds
(Position the main boom full up, roll deck out until deck cylinder is fully retracted, and extend
secondary boom completely. Then index the secondary boom “in” function and determine the
time required for boom to come in.)
DECK ROLL:
“A” Port, Deck Out:
7-9 Seconds
(Raise main boom to vertical, extend secondary boom out slightly so that deck can be articulated
without contacting the main boom, and roll deck in until deck cylinder is completely extended.
Then index the deck roll “out” function and determine the time required for the deck to roll out.)
“B” Port, Deck In: Target 7-9 Seconds (but DO NOT use Limit Screw)
(Raise main boom to vertical, extend secondary boom out slightly so that deck can be articulated
without contacting the main boom, and roll deck out until deck cylinder is completely retracted.
Then index the deck roll “in” function and determine the time required for the deck to roll in.)
BOOM
SWIVEL:
“A” Port, Boom Aft: 14-16 Seconds for 3PS, 3OS, SS
(Extend booms completely; rotate head to be level with ground, lower main boom until deck is
just above ground, and swivel boom full forward. Then index the boom swivel “aft” function and
determine the time required for the boom to swivel full aft. Use caution when doing this, stop
boom before main boom contacts tire.)
“B” Port, Boom Forward: 14-16 Seconds for 3PS, 3OS, SS
(Extend booms completely, rotate head to be level with ground, lower main boom until deck is
just above ground, and swivel boom aft until near tire. Then index the boom swivel “forward”
function and determine the time required for the boom to swivel full forward.)
(ASM-C-0082)
Summary of Contents for BENGAL JD6110-20M/R MY20
Page 4: ......
Page 6: ......
Page 7: ...Safety Section 1 1 2015 Alamo Group Inc SAFETY SECTION...
Page 25: ...SAFETY BOOM Safety Section 1 19 2015 Alamo Group Inc SAFETY...
Page 26: ...SAFETY BOOM Safety Section 1 20 2015 Alamo Group Inc SAFETY...
Page 27: ...SAFETY BOOM Safety Section 1 21 2015 Alamo Group Inc SAFETY...
Page 28: ...SAFETY BOOM Safety Section 1 22 2015 Alamo Group Inc SAFETY...
Page 29: ...SAFETY BOOM Safety Section 1 23 2015 Alamo Group Inc SAFETY...
Page 31: ...Assembly Section 2 1 ASSEMBLY SECTION JD6110 20 M R MY20 BENGAL BRUTE...
Page 48: ...ASSEMBLY Assembly Section 2 18 BOOM JOYSTICK DIAGRAM ASM C 0082A...
Page 57: ...Operation Section 3 1 2013 Alamo Group Inc OPERATION SECTION...
Page 102: ...OPERATION Boom Operation Section 3 46 2013 Alamo Group Inc OPERATION...
Page 103: ...Maintenance Section 4 1 2020 Alamo Group Inc MAINTENANCE SECTION...
Page 110: ...MAINTENANCE Boom Maintenance Section 4 8 2020 Alamo Group Inc MAINTENANCE...
Page 132: ...MAINTENANCE Boom Maintenance Section 4 30 2020 Alamo Group Inc MAINTENANCE...
Page 134: ...MAINTENANCE Boom Maintenance Section 4 32 2020 Alamo Group Inc MAINTENANCE...
Page 135: ...PARTS SECTION JD61xxM R MY20 BENGAL BRUTE w BUMPER TANK...
Page 142: ...BOOM MOUNT 2021 Alamo Group Inc Parts Section 8 JD6110 20 M R MY20 BENGAL BRUTE w BUMPER TANK...
Page 155: ...COMMON LEGAL REAR STOW T4 PARTS SECTION Common Section 6 1...
Page 158: ...PARTS ORDERING GUIDE 2015 Alamo Group Inc Common Parts Section 4 COMMON LEGAL REAR STOW T4...
Page 162: ...BENGAL BRUTE BOOM HOSES 2015 Alamo Group Inc Common Parts Section 8 COMMON LEGAL REAR STOW T4...
Page 164: ...BOOMREST 2015 Alamo Group Inc Common Parts Section 10 COMMON LEGAL REAR STOW T4...
Page 198: ...FRONT HYDRAULIC PUMP 2015 Alamo Group Inc Common Parts Section 44 COMMON LEGAL REAR STOW T4...
Page 202: ...FLAIL MOTOR BREAKDOWN 2015 Alamo Group Inc Common Parts Section 48 COMMON LEGAL REAR STOW T4...
Page 215: ...TROUBLESHOOTING 2015 Alamo Group Inc Common Parts Section 61 COMMON LEGAL REAR STOW T4...
Page 217: ...NOTES 2015 Alamo Group Inc Common Parts Section 63 COMMON LEGAL REAR STOW T4...
Page 218: ...WARRANTY SECTION Warranty Section 7 1...
Page 219: ......
Page 223: ...Printed in USA Tiger Corporation...