ASSEMBLY
Assembly Section 2-6
APPLICATION OF LOCTITE 2047
MOWER MAINFRAME MOUNTING BOLTS
(ASM-C-LOCTITE MNT BOLTS)
All mower mainframe mounting bolts shall be secured utilizing Loctite 2047 and
torqued per the Torque Chart in the maintenance section. Shake bottle for 60
seconds before use. To prevent clogging of nozzle, do not allow tip to touch
metal surfaces during application. If tip of nozzle becomes clogged, cut off tip as
required. If female threads are contaminated or rusty, clean threads by using a
thread chaser prior to installation of bolts. Apply thread locker to threads of bolts
as shown below. The allowable fixture time is (1) hour maximum. Therefore
bolts must be torqued within this time limit. The cure time is 72 hours at room
temperature, therefore machine is not to be used in actual application, except for
function testing, until the Loctite is allowed to cure.
Summary of Contents for BENGAL JD6110-20M/R MY20
Page 4: ......
Page 6: ......
Page 7: ...Safety Section 1 1 2015 Alamo Group Inc SAFETY SECTION...
Page 25: ...SAFETY BOOM Safety Section 1 19 2015 Alamo Group Inc SAFETY...
Page 26: ...SAFETY BOOM Safety Section 1 20 2015 Alamo Group Inc SAFETY...
Page 27: ...SAFETY BOOM Safety Section 1 21 2015 Alamo Group Inc SAFETY...
Page 28: ...SAFETY BOOM Safety Section 1 22 2015 Alamo Group Inc SAFETY...
Page 29: ...SAFETY BOOM Safety Section 1 23 2015 Alamo Group Inc SAFETY...
Page 31: ...Assembly Section 2 1 ASSEMBLY SECTION JD6110 20 M R MY20 BENGAL BRUTE...
Page 48: ...ASSEMBLY Assembly Section 2 18 BOOM JOYSTICK DIAGRAM ASM C 0082A...
Page 57: ...Operation Section 3 1 2013 Alamo Group Inc OPERATION SECTION...
Page 102: ...OPERATION Boom Operation Section 3 46 2013 Alamo Group Inc OPERATION...
Page 103: ...Maintenance Section 4 1 2020 Alamo Group Inc MAINTENANCE SECTION...
Page 110: ...MAINTENANCE Boom Maintenance Section 4 8 2020 Alamo Group Inc MAINTENANCE...
Page 132: ...MAINTENANCE Boom Maintenance Section 4 30 2020 Alamo Group Inc MAINTENANCE...
Page 134: ...MAINTENANCE Boom Maintenance Section 4 32 2020 Alamo Group Inc MAINTENANCE...
Page 135: ...PARTS SECTION JD61xxM R MY20 BENGAL BRUTE w BUMPER TANK...
Page 142: ...BOOM MOUNT 2021 Alamo Group Inc Parts Section 8 JD6110 20 M R MY20 BENGAL BRUTE w BUMPER TANK...
Page 155: ...COMMON LEGAL REAR STOW T4 PARTS SECTION Common Section 6 1...
Page 158: ...PARTS ORDERING GUIDE 2015 Alamo Group Inc Common Parts Section 4 COMMON LEGAL REAR STOW T4...
Page 162: ...BENGAL BRUTE BOOM HOSES 2015 Alamo Group Inc Common Parts Section 8 COMMON LEGAL REAR STOW T4...
Page 164: ...BOOMREST 2015 Alamo Group Inc Common Parts Section 10 COMMON LEGAL REAR STOW T4...
Page 198: ...FRONT HYDRAULIC PUMP 2015 Alamo Group Inc Common Parts Section 44 COMMON LEGAL REAR STOW T4...
Page 202: ...FLAIL MOTOR BREAKDOWN 2015 Alamo Group Inc Common Parts Section 48 COMMON LEGAL REAR STOW T4...
Page 215: ...TROUBLESHOOTING 2015 Alamo Group Inc Common Parts Section 61 COMMON LEGAL REAR STOW T4...
Page 217: ...NOTES 2015 Alamo Group Inc Common Parts Section 63 COMMON LEGAL REAR STOW T4...
Page 218: ...WARRANTY SECTION Warranty Section 7 1...
Page 219: ......
Page 223: ...Printed in USA Tiger Corporation...