MAINTENANCE AND OPERATION MANUAL
NOVA-65 SC/0111258-00
Tideland Signal
Page
13 of 32
0111258-00
Rev. B 16-Jun-16
Before replacing the housing, test the lantern by covering the sunswitch
located on the side of the housing with a piece of black electrical tape and
ensure battery is connected as described in Section 2.2.2.
2.3
Wiring
For an installation consisting of a single light, simply switching on power is sufficient
to operate the light. For multiple Nova-65 SC units, SYNC and SYNC RET terminals
are connected as shown in Figure 9.
Figure 9 System Wiring Diagram (Cable access is optional)
3.0 OPERATION
3.1
Safety
WARNING! High Powered LED sources produce an extremely intense and
concentrated light source. Direct viewing of the LED should be avoided.
3.2
Configuration
The Nova-65 SC can be configured by opening the housing and using the
SignalView application from Tideland. Instructions for connection and operation of
the SignalView application come with the SignalView kit P/N 901.1227-00.
Refer to SignalView Manual, P. N. 011.1231-00.