Thor Fiber 2018 Tel: (800) 521-8467 Email: [email protected] http://www.thorbroadcast.com
Chapter 2 Installation Guide
2.1 Acquisition Check
When user opens the package of the device, it is necessary to check items according to packing list.
Normally it should include the following items:
Universal Satellite and ATSC IRD
User’s Manual
HDMI Cable
YPbPr Cable
CVBS Cable
SDI Cable
Audio adapt cables
Power Cord
If any item is missing or mismatching with the list above, please contact our company.
2.2 Installation Preparation
When users install device, please follow the below steps. The details of installation will be described
at the rest part of this chapter. Users can also refer rear panel chart during the installation.
The main content of this chapter including:
Checking the possible device missing or damage during the transportation
Preparing relevant environment for installation
Connecting signal cables
Connecting communication port with PC
2.2.1 Device's Installation Flow Chart Illustrated as following
:
Connecting
Grouding
Wire and
Power
Cord
Acquisition
Check
Fixing
Device
Setting
Parameter
Running
Device
Connecting
Signal Wire