BOILER MOUNTING
INSTALLATION
7
3.
BOILER MOUNTING
3.1.
Transportation and delivery
The boiler is delivered on wood pallet, well positioned with metal plates. Remove them carefully
by unscrewing the screws holding them in place.
The loading and unloading of the boiler must be performed with a forklift or a crane. A special
hook is provided on the upper part of the boiler for lifting.
The boiler is heavy. Do not try to lift by hands or other unsuitable equipment.
Danger of injury! Perform all moves with extreme attention and care.
Remove the boiler packaging with attention. Keep the packaging material away from
chidren since it can be dangerous. After having unpacked everything, make sure that the
appliacne is intact and undamaged. In case of doubt do not use the appliance and inform the
supplier.
The PLC boiler is delivered with the following equipment already fitted and mounted:
Boiler steel body
Glasswool insulation mounted on the boiler body and tightened with plastic tapes
Metal covers mounted on the boiler body
Turbinators positioned inside the fire tubes
Pellet burner
Fuel feeder
Fuel tank
The following accessories are positioned inside the boiler body. Remove them carefully by
opening the middle door.
Cleaning tools
In the documentation folder you will find:
Technical manual
Warranty leaflet