THERMOSTAHL MULTIPLEX MCL Instruction Manual Download Page 14

For boilers up to 70 KW 

– at least 2 m  

For boilers bigger than 70 KW 

– at least 2,4 m  

For boilers bigger than 230 KW 

– at least 3 m  

For boilers bigger than 400 KW 

– at least 3,5 m.  

 

 

 

Conform  PT  C  9-2003  the  access  in  the  boiler  room  of  persons  other  than  the  authorised 

personal in boiler exploitation and of the auxilliar equipment is prohibited.  

The inspectors from ISCIR-INSPECT IT or likewise  authorities,  as much as the authorised 

personal  for  technical  surveilance  may  enter  anytime  in  the  boiler  room  on  the  basis  of  acces 
card or special control documents.  

!It  is  prohibited  to  give  another  destination  to  the  boiler  room,  except  the  one 

established in the project. 

 

The  acces  and  service  spaces  of  various  places  in  the  boiler  room,  as  much  as  the  exits 

ways to the doors should be always free.  

In  the  boilers  room  of  a  greater  nominal  power  than  300  KW,  it  should  be  a  telephone  or 

other means of comunication with the exterior, which  will avoid the useless walking of the boiler 
operators.  

In  a  vizible  place  of  the  boilers  room,  there  would  be  listed  the  work  instructions  that  will 

consider  the  speciffic  of  the  boilers  in  the  room.  There  will  be  also  listed  internal  instructions 
concerning the operators task and the way of operating the boiler.  

Observations: 

 

In the boiler’s room :  

 

a. must be clean;  

 

b. the flamable objects should be removed;  

 

c. must have a sewerage system;  

 

d. must be enough ventilation;  

 

e.  the  fuel  reservoirs  will  be  placed  in  separate  spaces  outside  the 

boiler’s  room  and  be  well  ventilated.  If  they  are  placed  in  the  boiler’s  room  they 
should  be  separated  by  this  one  by  a  separating  wall,  in  conformity  with  the  valid 
safety rules;  

 

f.  there,  must  exist  a  powder  fire  estinguisher  next  to  the  burner  and  a 

hand fire estinguisher next to the door;  

 

g. the chimney must be safe and with an adeqvate section;  

 

h.  it  is  advisable  that  the  fuel  tank  (if  it’s  the  case)  to  be  installed  in  a 

place away from sun rays, rain or fire sources ;  

 

i.  in  case  there  is  an  alarm  system,  a  smoke  detector  must  be  installed 

on the ceiling of the boiler room;  

 

j.  the  door  must  be  metalic,  without  louvers  or  glass  and  it  must  open 

twards the outside;  

! It is forbiden to install the boiler in spaces with a lot of dust, dangerous gases or in 

places with great humidity like the bathrooms.

  

 

Summary of Contents for MULTIPLEX MCL

Page 1: ...MULTIPLEX MCL INSTRUCTION MANUAL ver 1 1...

Page 2: ...tory The name THERMOSTAHL means GUARANTEE for the buyer THERMOSTAHL provides heating solutions for more than 20 years on the market The production experience and the expertise gives us the opportunity...

Page 3: ...TIVES SPECIFICATIONS 3 PREFACE 4 1 DESCRIPTION 5 2 DELIVERY TRANSPORT 5 3 FEATURES OF THE BOILER MULTIPLEX 9 4 BOILER LOCATION 12 5 CHIMNEY 14 6 BOILER ASSEMBLING 16 7 CONTROL PANEL 16 8 MAINTENANCE G...

Page 4: ...Electrical conections between burner and boiler Standard 763 Central heating boilers Minimum dimensions of the combustion chamber Standard 234 Central heating boilers Terminology nominal power techni...

Page 5: ...Familiarize yourself with its operations and controls and follow strictly the instructions given If you have any questions or you need more information about particular points concerning the THERMOSTA...

Page 6: ...is designed in such a way that all the surfaces that come in contact with the flame to be cooled by water including the grid where the ash and the remains of burning are The two ways of exhaust from t...

Page 7: ...e the boiler during transport on the transport means so as not to slip Consider seriously that the gravity centre is above the geometric centre That means there is need of a special care during transp...

Page 8: ...780 210 209 180 2 360 11 370 x 625 1150 600 0 37 900 230 233 200 2 420 13 5 370 x 625 1400 600 0 37 900 260 256 220 2 450 14 370 x 625 1400 600 0 37 900 290 291 250 3 620 17 370 x 625 1100 950 0 37 14...

Page 9: ...480 295 130 2 260 910 1600 1850 1900 810 1730 610 100 1570 930 1500 1480 295 130 2 290 1100 2000 2000 1840 1000 2250 830 150 1570 930 1250 1210 345 130 2 350 1100 2000 2000 2090 1000 2250 830 150 2160...

Page 10: ...ucing the number of ignition starts of the burner in case of adapting of a burner Reliability Energy savings Enviromental friendly Modern Design Solid Construc ion Easy maintenance Big fire box Large...

Page 11: ...d pipe that crosses the rear plate and the combustion chamber and which has an optimal length to ensure a better air intake The ventilator is controled by the control panel and the conection of the ve...

Page 12: ...ned in such a way that all its parts in touch with flames to be cooled by water The profile number and length of the smoke pipes are designed specially for a maximal exploitation of the exhausts The w...

Page 13: ...ance fireproof doors and without woods for windows The boilers having the caloric flow of 0 1 Gcal h can be located in rooms having other destinations in which it will be arranged an appropriate space...

Page 14: ...would be listed the work instructions that will consider the speciffic of the boilers in the room There will be also listed internal instructions concerning the operators task and the way of operatin...

Page 15: ...ds grass etc The cleaning of the chimney esspecially in the exit points from the boiler and the elbows where the exhaust gases change their course A clean chimney means a correct draught The insulatio...

Page 16: ...sons for malfunction of solid fuels boilers 1 Small active height of the chimney 2 Untight masonry of the chimney 3 Too narow masonry of the chimney 4 The existence of foreign parts or narowing of the...

Page 17: ...70 boilers we have only one cover for the sides For the other boiler series we have two or three covers for the sides 7 THE CONTROL PANEL Digital Electronic Controller PWC 1000 Operating instructions...

Page 18: ...maximum exhaust temperature that the fan power starts to decrease 08 IGNITION TIME Maximum time of the process ignition Fan power is determined only by the ignition air setting at this process 09 IGNI...

Page 19: ...ng Increased fuel consumption Increasing temperature of exhausts Carbon layers Reduced draught Maintenance instructions Disassemble the burner if necessary Open the doors Disassemble the turbulators f...

Reviews: