BOILER MOUNTING
5
3.
BOILER MOUNTING
3.1.
Transportation and delivery
The boiler is delivered on wood pallet. The loading and unloading of the boiler must be performed
with a forklift or a crane.
The boiler is very heavy. Do not try to lift by hands or other unsuitable
equipment. Danger of injury! Perform all moves with extreme caution.
Remove the boiler packaging with attention. Keep the packaging material away from
children since it can be dangerous. After having unpacked everything, make sure that the
appliance is intact and undamaged. In case of doubt do not use the appliance and inform the
supplier.
The COMPACT boiler is delivered with the following equipment:
Boiler steel body
Rockwool insulation mounted on the boiler body
Metal covers mounted on the boiler body
Incorporated pellet tank at the back of the boiler
Fuel feeder system
Pellet grate made of INOX steel
Ash box under the grate
Leveling supports
Electrical cable with plug
In the documentation folder you will find:
Technical manual
Warranty leaflet
3.2.
General requirements
The boiler must be installed according to the applicable regulations as far as the chimney
installation and safety regulations are concerned. The installation should be performed only by
authorized personnel, and special care must be taken for the correct installation and draught of
the chimney.
The boiler must be placed on a horizontal plane, with adequate mechanical resistance to support
the boiler’s weight. The boiler can be installed in a special boiler room, or inside the house. The
installation must be performed in such a way so that it is easily accessible from all the sides.
The lack of draught from the chimney, or the obstruction of air intake can affect the correct
function of the product, cause error in the ignition, and even emit smoke.
The regular maintenance of the boiler must be performed at least once a year by an
authorized technician.
Special care must be taken for the air intake of the boiler, especially if the boiler is installed
in a narrow space.
Place a protective fireproof base (metal or ceramic) between the boiler and the floor,
especially if the floor is made of flammable material (wood, carpet).This board must be at
least 25-30 cm bigger in all directions than the dimensions of the boiler.
A safety distance is recommended between the sides of the boiler and walls, of at least 40
cm. This distance should be even bigger according to the objects close to the boiler (furniture,
curtains, decoration, etc.).
Make sure that the chimney remains clean and free of ash and obstacles at all times.
Pay attention so that the room temperature sensor positioned at the back of the boiler is not
close to the chimney.
Before every startup, or after an error or blackout, make sure that the grate is not full with
ash or pellet and the door is tightly closed.
After a fault startup, remove the unburnt pellet from the grate before you make a new startup.