background image

SERVICE AND MAINTENANCE 
 

25 

 

7.3.

 

Basic service procedures 

7.3.1.

 

Service after overheating 

If overheating occurs, the safety valves of the boiler must open. If the boiler is equipped with 
an overheating protection coil, cold water will enter the coil to protect the boiler.  

Make sure the boiler pump is working. In case of blackout open all the valves of the system to 
let hot water out of the boiler. In any  case a blackout protection UPS is recommended to be 
installed on the boiler pump. 

If the chimney damper is not fully opened, put it in fully open position. 

All safety devices must lead to drainage! After overheating, make sure that all the water from 
the safety devices has drained, and the system has filled with cold water. Check the pressure 
and the temperature of the boiler.  

At overheating, the safety thermostat will activate, and cut electrical supply to the fan. In that 
case, you need to manually reset the safety thermostat and put the system back in function. 
Unscrew the plastic cover of the safety thermostat and press the switch. Put the plastic cover 
back. 

 Verify the causes of the overheating! If it happens again, check the installation 

and function of the pumps and safety devices! 

 

7.3.2.

 

Service after feeder blockage 

If a blockage occurs to one of the feeders, you will have to remove the axes in order to clean 
the feeding tubes. The same procedure is applicable at the annual maintenance procedure.  

 Before proceeding to any of the following steps, make sure the boiler function is 

stopped, the boiler is cool, and it is disconnected from the electricity. Do not try to do 
any  works  while  the  motor  is  working  and  the  control  panel  is  activated!  Risk  of 
injury! 

REMOVING THE UPPER AXIS 

 

Remove the protection cover of the transmission system.

 

 

Remove the two gears from the axes by unscrewing the headless inserted screws keeping 
them in place. 

You do not need to unmake the chain! Remove them all together with 

the chain.  

 

Unscrew the four nuts from the back side of the flange (see Fig 15)

 

 

 

Fig 15.

 

Removing the upper axis flange 

Summary of Contents for BIOPLEX MCL-BIO

Page 1: ...BIOMASS SOLID FUEL RETORT BOILER BIOPLEX MCL BIO INSTALLATION AND SERVICE MANUAL VERSION 2 1 UPDATE 10 10 2013...

Page 2: ...n 17 5 ELECTRICAL CONNECTIONS 18 5 1 General instructions 18 5 2 Control panel functions 18 5 3 Wiring diagram 19 6 BOILER START UP 20 6 1 Initial lighting checks 20 6 2 Start up 20 6 3 Checks to carr...

Page 3: ...e appliance unless you have contacted the company and an authorized service contractor Only original accessories and spare parts must be used to ensure correct and safe function Make sure you respect...

Page 4: ...MAG DESCIPTION OF BOILER COMPONENTS Steel boiler body with cylindrical heat exchanger Removable rear smoke box with inspection cleaning door Upper door for cleaning the heat exchanger Middle door for...

Page 5: ...stion The flange on the middle door has a rotating clamp for secondary air adjustment and flame inspection If necessary this flange can be removed and a burner can be placed in its position 2 2 2 Furn...

Page 6: ...40 1750 295 2 1 MCL BIO 160 600x360 910 810 1700 1830 1600 1720 1240 2000 295 2 1 MCL BIO 180 600x360 910 810 1700 1830 1600 1720 1240 2300 295 2 1 MCL BIO 200 500x810 1100 1000 2050 1350 2000 2160 15...

Page 7: ...00 41 3 650 4 0 5 0 600 370 460 MCL BIO 45 45 000 52 3 750 5 0 6 5 700 370 500 MCL BIO 53 53 000 61 3 850 6 0 7 0 800 370 550 MCL BIO 60 60 000 69 3 950 7 0 8 5 900 370 600 MCL BIO 70 70 000 81 3 700...

Page 8: ...10 13 0 6 Wood chips 4 3 5 25 20 4 6 Barks 2 6 5 25 20 8 10 Wood 4 4 3 20 4 8 Wood briquette 5 2 10 4 Table 1 Characteristics of different types of fuels Every type of biomass fuel contains a signifi...

Page 9: ...he supplier The BIOPLEX boiler is delivered with the following equipment already fitted and mounted Boiler steel body Rockwool insulation mounted on the boiler body and tightened with plastic tapes Me...

Page 10: ...ing system according to the regulations in force In case that the building is designed with a fire alarm system a smoke detector must be positioned on top of every boiler The fuel storage is prohibite...

Page 11: ...nnection with the boiler s chimney pipe must be air tight The chimney must be equipped with a cleaning door at its base Also cleaning doors are recommended where there are changes in direction and ash...

Page 12: ...BOILER MOUNTING 12 Fig 4 Chimney connection...

Page 13: ...s fuel If a connection pipe is not used it must be sealed before water fill Legend T1 Outlet T2 Return T3 Chimney pipe T4 Discharge valve connection T5 Safety kit connection T6 Additional safety conne...

Page 14: ...ter outlet However we recommend that the valve is fitted on the cold water inlet For the protection of the valve a filter is recommended to be installed on the water line before the valve On the oppos...

Page 15: ...mains water supply affects the boiler s life span It is recommended to use a water softener if water hardness exceeds 15o f Do not fill the system at the working pressure When the boiler will be heate...

Page 16: ...n valves 10 11 Radiator valves 12 Radiators 13 15 Safety valves 16 Filling valve 17 Drainage valve 18 Cold water valve 19 24 One way valves B Hot water boiler VED Open expansion vessel PCI Central hea...

Page 17: ...11 Radiator valves 12 Radiators 13 15 Safety valves 16 Filling valve 17 Drainage valve 18 Cold water valve 19 24 One way valves B Hot water boiler VE Closed expansion vessel PCI Central heating pump...

Page 18: ...0 90o C This temperature should never be set below 60o C The fan speed regulator regulates the fan rotating speed by means of a dimmer rheostat The pump thermostat starts the circulation pump function...

Page 19: ...k plate to have access to the connection terminals in the interior Connect the main electrical supply to the terminals 1 2 3 as indicated The fan is connected to the terminals 10 11 12 and the pump to...

Page 20: ...onding switch Keep the fan deactivated during this step Set the first timer T1 to maximum and the second T2 to zero in order to fill the furnace with fuel Fill it until the fuel level reaches the cast...

Page 21: ...must be set in such a way so that the quantity of fuel fed is stable to a level where it makes a small hill over the plate covering almost half of its surface middle picture If the fuel accumulates co...

Page 22: ...st be clear grey Black smoke means lack of air supply If too much ash and big coal pieces fall down to the ash box reduce the air supply The flame is too fast dry and might make a noise 6 6 Chimney da...

Page 23: ...nger Remove the turbinators from the tubes and clean the tubes with the appropriate tool Afterwards clean the exterior surface of the cylindrical heat exchanger with the exchanger cleaning tool as sho...

Page 24: ...feeding is performed freely and the fuel is evenly distributed at the plate surface Check the function of the motoreducer and the fan Clean from dust if needed 7 2 Maintenance intervals 7 2 1 Daily ma...

Page 25: ...ety thermostat and put the system back in function Unscrew the plastic cover of the safety thermostat and press the switch Put the plastic cover back Verify the causes of the overheating If it happens...

Page 26: ...e the protection cover of the transmission system Remove the two gears from the axes by unscrewing the headless inserted screws keeping them in place You do not need to unmake the chain Remove them al...

Page 27: ...fuel has all the time a certain amount of fuel in the fire chamber which will not stop burning immediately For safety reasons it is recommended you have installed a UPS with a battery which assures fu...

Page 28: ...he correct temperature and all the thermostats function properly Make sure the bulbs are properly positioned in the case Make a general check of the chimney and make sure it is clean and free of obsta...

Page 29: ...chapter 7 3 2 Check the motoreducer Check the oil level in the reducer and add oil if necessary Remove the two feeders Check them and make sure they are in good shape and not deformed Clean the tubes...

Page 30: ...ct sealing cord of the door insufficient chimney draught too high air supply by the fan regulate the doors so that the sealing cord stays tight check replace the sealing cord check clean the chimney r...

Page 31: ...freezing Incident of explosion due to use of impropriate chemical substances Electrical shocks that may harm electrical parts of the appliance 4 Warranty is only valid if the installation is performed...

Page 32: ...THERMOSTAHL ROMANIA SISTEME TERMICE S R L DRUMUL OSIEI 57 59 sector 6 Bucharest 062395 Romania www thermostahl ro...

Reviews: