BOILER START-UP 
 

20 

 

6.

 

BOILER START-UP 

6.1.

 

Initial lighting checks 

Before you start the boiler, make the following checks:  

 

Check that all the hydraulic connections and make sure they are tight. Make sure there is 
no leakage or moisture on the pipes or other equipment.  

 

Make sure that the connection with the chimney is air-tight and the chimney installation is 
properly made.  

 

Check that the controller bulbs are well inserted and secured in the boiler’s case. 

 

Make sure that the pressure in the network is correct.  

 

Check that the boiler pump and the central heating pumps function properly. 

 

Make  sure  that  the  connection  with  the  expansion  vessel  is  correct  and  the  expansion 
volume is sufficient for the boiler. No valves should be installed between the boiler and the 
expansion vessel. 

 

Make sure the boiler’s separation valves are open. 

 

Make sure that there is sufficient air supply and natural ventilation in the boiler room.  

                  

 

 Do not store inflammable materials or fuel close to the boiler!  Before  you light 

the boiler make sure the boiler room is clear and safe. 

 

6.2.

 

Start-up 

To correctly start up the BIOPLEX boiler follow the next steps: 

 

Make sure the silo is full with fuel.  

 

Make sure the chimney damper is positioned in horizontal position (completely open). 

 

Open the middle door (feeding door) to have visual supervision of the feeding procedure.  

 

Turn  the  control  panel  on  from  the  general  switch  and  activate  only  the  motor  from  the 
corresponding switch. Keep the fan deactivated during this step. 

 

Set  the  first  timer  T1  to  maximum  and  the  second  T2  to  zero,  in  order  to  fill  the  furnace 
with fuel. Fill it until the fuel level reaches the cast iron plate and covers a small part of it. 

 

Stop the motor function from the motor switch.    

 

Using  sheets  of  thin  paper  or  other  ignition  material,  light  the  fuel  placed  in  the  furnace. 
Wait several minutes until the flame stabilizes and covers the entire plate surface.   

 

Close the middle door of the boiler. Turn on the fan by the corresponding switch. During this 
step the motor must remain deactivated.  

 

When  the  flame  is  fully  developed,  activate  both  the  motor  and  the  fan.  Set  the  furnace 
thermostat to the required temperature.  

 

Follow the instructions given in the chapter Combustion Regulation to correctly regulate the 
combustion.    

 It is prohibited to light the boiler with inflammable or explosive liquids.  

  

6.3.

 

Checks to carry after initial start-up 

During  the  first  start-up  you  need  to  carefully  check  the  air-tightness  of  all  the  connections, 
especially the doors and the connection with the chimney. 

Check  that  the  thermostats  function  properly  and  devices  operate  accordingly.  Wait  for  the 
boiler  to  reach  the  preset  temperature  and  make  sure  the  fan  stops  properly  and  the  flame 
falls down.  

Check  the  temperature  and  pressure  rise  in  the  network.  Make  sure  it  is  according  to  the 
indications. Check if there is any water leakage in the network.  

After burning of the fuel is completed, check the situation inside the boiler. If the walls are too 
black,  it  means  that  there  is  insufficient  air  supply.  If  there  is  condensation  forming  on  the 

Summary of Contents for BIOPLEX MCL-BIO

Page 1: ...BIOMASS SOLID FUEL RETORT BOILER BIOPLEX MCL BIO INSTALLATION AND SERVICE MANUAL VERSION 2 1 UPDATE 10 10 2013...

Page 2: ...n 17 5 ELECTRICAL CONNECTIONS 18 5 1 General instructions 18 5 2 Control panel functions 18 5 3 Wiring diagram 19 6 BOILER START UP 20 6 1 Initial lighting checks 20 6 2 Start up 20 6 3 Checks to carr...

Page 3: ...e appliance unless you have contacted the company and an authorized service contractor Only original accessories and spare parts must be used to ensure correct and safe function Make sure you respect...

Page 4: ...MAG DESCIPTION OF BOILER COMPONENTS Steel boiler body with cylindrical heat exchanger Removable rear smoke box with inspection cleaning door Upper door for cleaning the heat exchanger Middle door for...

Page 5: ...stion The flange on the middle door has a rotating clamp for secondary air adjustment and flame inspection If necessary this flange can be removed and a burner can be placed in its position 2 2 2 Furn...

Page 6: ...40 1750 295 2 1 MCL BIO 160 600x360 910 810 1700 1830 1600 1720 1240 2000 295 2 1 MCL BIO 180 600x360 910 810 1700 1830 1600 1720 1240 2300 295 2 1 MCL BIO 200 500x810 1100 1000 2050 1350 2000 2160 15...

Page 7: ...00 41 3 650 4 0 5 0 600 370 460 MCL BIO 45 45 000 52 3 750 5 0 6 5 700 370 500 MCL BIO 53 53 000 61 3 850 6 0 7 0 800 370 550 MCL BIO 60 60 000 69 3 950 7 0 8 5 900 370 600 MCL BIO 70 70 000 81 3 700...

Page 8: ...10 13 0 6 Wood chips 4 3 5 25 20 4 6 Barks 2 6 5 25 20 8 10 Wood 4 4 3 20 4 8 Wood briquette 5 2 10 4 Table 1 Characteristics of different types of fuels Every type of biomass fuel contains a signifi...

Page 9: ...he supplier The BIOPLEX boiler is delivered with the following equipment already fitted and mounted Boiler steel body Rockwool insulation mounted on the boiler body and tightened with plastic tapes Me...

Page 10: ...ing system according to the regulations in force In case that the building is designed with a fire alarm system a smoke detector must be positioned on top of every boiler The fuel storage is prohibite...

Page 11: ...nnection with the boiler s chimney pipe must be air tight The chimney must be equipped with a cleaning door at its base Also cleaning doors are recommended where there are changes in direction and ash...

Page 12: ...BOILER MOUNTING 12 Fig 4 Chimney connection...

Page 13: ...s fuel If a connection pipe is not used it must be sealed before water fill Legend T1 Outlet T2 Return T3 Chimney pipe T4 Discharge valve connection T5 Safety kit connection T6 Additional safety conne...

Page 14: ...ter outlet However we recommend that the valve is fitted on the cold water inlet For the protection of the valve a filter is recommended to be installed on the water line before the valve On the oppos...

Page 15: ...mains water supply affects the boiler s life span It is recommended to use a water softener if water hardness exceeds 15o f Do not fill the system at the working pressure When the boiler will be heate...

Page 16: ...n valves 10 11 Radiator valves 12 Radiators 13 15 Safety valves 16 Filling valve 17 Drainage valve 18 Cold water valve 19 24 One way valves B Hot water boiler VED Open expansion vessel PCI Central hea...

Page 17: ...11 Radiator valves 12 Radiators 13 15 Safety valves 16 Filling valve 17 Drainage valve 18 Cold water valve 19 24 One way valves B Hot water boiler VE Closed expansion vessel PCI Central heating pump...

Page 18: ...0 90o C This temperature should never be set below 60o C The fan speed regulator regulates the fan rotating speed by means of a dimmer rheostat The pump thermostat starts the circulation pump function...

Page 19: ...k plate to have access to the connection terminals in the interior Connect the main electrical supply to the terminals 1 2 3 as indicated The fan is connected to the terminals 10 11 12 and the pump to...

Page 20: ...onding switch Keep the fan deactivated during this step Set the first timer T1 to maximum and the second T2 to zero in order to fill the furnace with fuel Fill it until the fuel level reaches the cast...

Page 21: ...must be set in such a way so that the quantity of fuel fed is stable to a level where it makes a small hill over the plate covering almost half of its surface middle picture If the fuel accumulates co...

Page 22: ...st be clear grey Black smoke means lack of air supply If too much ash and big coal pieces fall down to the ash box reduce the air supply The flame is too fast dry and might make a noise 6 6 Chimney da...

Page 23: ...nger Remove the turbinators from the tubes and clean the tubes with the appropriate tool Afterwards clean the exterior surface of the cylindrical heat exchanger with the exchanger cleaning tool as sho...

Page 24: ...feeding is performed freely and the fuel is evenly distributed at the plate surface Check the function of the motoreducer and the fan Clean from dust if needed 7 2 Maintenance intervals 7 2 1 Daily ma...

Page 25: ...ety thermostat and put the system back in function Unscrew the plastic cover of the safety thermostat and press the switch Put the plastic cover back Verify the causes of the overheating If it happens...

Page 26: ...e the protection cover of the transmission system Remove the two gears from the axes by unscrewing the headless inserted screws keeping them in place You do not need to unmake the chain Remove them al...

Page 27: ...fuel has all the time a certain amount of fuel in the fire chamber which will not stop burning immediately For safety reasons it is recommended you have installed a UPS with a battery which assures fu...

Page 28: ...he correct temperature and all the thermostats function properly Make sure the bulbs are properly positioned in the case Make a general check of the chimney and make sure it is clean and free of obsta...

Page 29: ...chapter 7 3 2 Check the motoreducer Check the oil level in the reducer and add oil if necessary Remove the two feeders Check them and make sure they are in good shape and not deformed Clean the tubes...

Page 30: ...ct sealing cord of the door insufficient chimney draught too high air supply by the fan regulate the doors so that the sealing cord stays tight check replace the sealing cord check clean the chimney r...

Page 31: ...freezing Incident of explosion due to use of impropriate chemical substances Electrical shocks that may harm electrical parts of the appliance 4 Warranty is only valid if the installation is performed...

Page 32: ...THERMOSTAHL ROMANIA SISTEME TERMICE S R L DRUMUL OSIEI 57 59 sector 6 Bucharest 062395 Romania www thermostahl ro...

Reviews: