pg. 9
4.4
4.4
4.4
4.4
4.4 WIRING DIAGRAM F25 - F30
The electrical connections must be made before mounting the left side panel as the terminal block is located behind the
left side panel (see the figure below on the right).
CAUTION: IT IS MANDATORY TO EARTH THE CENTRAL HEATING COOKER AS ILLUSTRATED IN THE ABOVE DIAGRAM. IF
THIS INSTRUCTION IS NOT OBSERVED SERIOUS DAMAGE, WHICH IS NOT COVERED BY WARRANTY, WILL RESULT TO THE
BODY OF THE CENTRAL HEATING COOKER. HAVE AN ELECTRICIAN CHECK THE EARTHING. THERE MUST BE NO ELECTRIC
POTENTIAL (VOLTS) BETWEEN THE EARTH OF THE CENTRAL HEATING COOKER
EARTH AND THE ACTUAL EARTH OF THE
PLANT.
CAUTION: IT IS MANDATORY TO EARTH THE CENTRAL HEATING COOKER AS ILLUSTRATED IN THE ABOVE DIAGRAM. IF
THIS INSTRUCTION IS NOT OBSERVED SERIOUS DAMAGE, WHICH IS NOT COVERED BY WARRANTY, WILL RESULT TO THE
BODY OF THE CENTRAL HEATING COOKER. HAVE AN ELECTRICAIN CHECK THE EARTHING. THERE MUST BE NO ELECTRIC
POTENTIAL (VOLTS) BETWEEN THE EARTH OF THE CENTRAL HEATING COOKER
EARTH AND THE ACTUAL EARTH OF THE
PLANT.
45
0 m
m
se
pa
re
te
in
le
gn
o
450 mm se
soffitto in legno
soffitto in muratura
250 mm se
The electrical connections must be made before mounting the left side panel as the terminal block is located behind the
left side panel (see the figure below on the right).
4.3
4.3
4.3
4.3
4.3 WIRING DIAGRAM 25 - 30
Key
pump
circulating pump
anticondensation thermostat
Key
pump
circulating pump
anticondensation
thermostat
oven light
Legenda
pompa
circolatore
anticondensa
Legenda
pompa
circolatore
anticondensa
luce forno