Page.3
We hope you really enjoy the warmth of your new gas fire. Read these instructions carefully before in-
stalling and using the gas fire. Keep these instructions in a safe place. Always provide the following infor-
mation if the gas fire breaks down: model and serial number, which can be found on the unit.
Your pur-
chase invoice is your proof of warranty.
1. General
The entire unit is delivered to you with your choice of mantle and/or accessories. See the installation instructions
for the relevant mantle and/or accessories that are packaged separately from the unit. Check the unit immediately
after delivery to confirm that it has not been damaged during transport. If it is damaged in any way, please in-
form your supplier immediately and provide as many details as possible.
Attention
The unit must be installed, connected and checked by a qualified fitter based on national, regional, and local
standards and regulations. The fitter must inspect the unit for tightness in relation to gas and combustion prod-
ucts and correct operation of the different components and functions.
The flue tube system and the outlets in the outer wall or roof face must also meet the requirements of the applica-
ble regulations.
The unit falls in the closed unit category, in a set-up location without a fan and with a chimney loss that is
greater than 17% (non-condensing).
Warning
Gas fires become hot when in use. Therefore care should be taken, for example, by keeping children and those
requiring help away from the immediate vicinity of burning fires. Gas fires must not be placed on or against
flammable materials (curtains, etc.).
Contents of the packaging
1 x Fully assembled unit:
Trimline 100 (1036) or Trimline120 (1037) or Trimline Tunnel 120 (1038) or Trimline 140 (1039)
1 x Remote control
2 x Restriction plate
1 x 9V battery
4 x 1.5V AA batteries
1 x Operating and installation instructions
1 x Wood imitation set
2 x Suction cap
1 x Mantle iron
Additional
Pebble set
Carrara stones
Summary of Contents for Trimline 100
Page 14: ...Page 14 A B 6 4 2 3 1 7 5 9 6 8 11 10 12 100 100 2 3 1 9 6 7 5 4 8 6 12 11 10 ...
Page 17: ...Page 17 ...
Page 26: ...Page 26 H G M N O E B D I A F C J K L P ...
Page 27: ...Page 27 1 2 1036 1037 1039 4 3 1038 ...
Page 28: ...Page 28 14 6 13 5 ...
Page 29: ...Page 29 7 8 ...
Page 30: ...Page 30 1036 A B ...
Page 31: ...Page 31 1037 1038 A B ...
Page 32: ...Page 32 1039 A B ...
Page 33: ...Page 33 Pebles Carara 10 9 ...
Page 34: ...Page 34 16 15 14 13 12 11 ...
Page 35: ...Page 35 ...
Page 36: ...Page 36 TTI d o o Thermo Technology International ...