CE-EMC Protection Installation Procedure
Procedure
E-2
LevelPRO Installation Guide
Thermo Fisher Scientific
The EMC protection board wires are run through the connection fittings
at the factory so that the cable gland between the EMC board housing and
the detector housing could be factory sealed. There are 14 wires in total:
two for DC power and 12 for input/output or communication wiring.
Figure E–1.
EMC protection board assembly
Figure E–2.
Bracket assembly
Summary of Contents for LevelPRO Series
Page 2: ......
Page 3: ...LevelPRO Continuous Gamma Level System Installation Guide P N 717760 Revision H ...
Page 4: ......
Page 6: ...This page intentionally left blank ...
Page 8: ...This page intentionally left blank ...
Page 14: ...This page intentionally left blank ...
Page 28: ...This page intentionally left blank ...
Page 40: ...This page intentionally left blank ...
Page 48: ...This page intentionally left blank ...
Page 96: ...This page intentionally left blank ...
Page 106: ...This page intentionally left blank ...