iCAP Customer Familiarisation Manual
Page 38 of 72
This document is part numbered 849940090071
Version 1.02
Introduce the sample “Method development standard” (high standard concentration solution of
the selected element(s)). Ensure you leave enough time for the sample to enter the plasma and
then click OK. This procedure will set the default position for this line until the next auto peak
adjustment takes place. If all elements are not in the same solution then multiple standards may
be used.
The result of the test is displayed in the bottom (right side) of the page. If the test is unsuccessful
or partially successfully there is a message in the log view tab stating the reason of the failure.
This is normally due to the solution not being aspirated for long enough before the test began, or
a problem with the solution.
7.8 Setting the pump tension.
To ensure long life of the pump tubing and correct operation the pump tensioning has to be
performed.
The pump tension can be adjusted with the plasma running and the pump stopped. Lock the
sample pump tubing and clamp into position. Release the tension adjustment and allow the