Before connecting power, verify, again, all gas lines were checked and not
leaking.
• Connect main power cord (no color code) to correct utility source.
• It is strongly recommended that a UPS (Uninterrupted Power
Supply) (
● ●
●
) be used. The purpose of this connection is to
maintain power to the controls during a power outage.
• If UPS power is not available or not used, then the UPS Jumper
connector must be put in place of the UPS cable.
1.3 Power
Connections
UPS Jumper
Figure 5.
UPS Jumper
Ensure the S.U.B. unit is in its intended position.
• Lock the vessel in place by lowering the leveling feet. Ensure that
unit is level before operation.
• Using the Allen wrench provided with S.U.B. unit shipping
documents, remove the load cell shipping plates and secure them
in the bracket at the rear of the control tower. There are two ¼-20
socket head cap screws that need to be removed from each load
cell protection plate. Move the tower to desired position and lock
in place and level using the leveling feet.