S.U.B. TK Resistive Quick Start Guide
Quick Start Guide
1.1 Orientation and
Location
Section 1
Hardware Installation
The Single-Use Bioreactor hardware is shipped directly from the
manufacturer and will arrive crated. For unpacking instructions and
detailed contents of the crate, please refer to the uncrating instructions
that came with the shipment. Be sure to follow the unpacking instructions
provided and retain all packaging materials.
Tools Needed:
• Allen wrench provided in shipping documentation packet
• Adjustable wrench needed for leveling feet (not supplied)
a.
Position reactor and tower in desired location and lock wheels
ensuring availability of needed utilities (power, gas, etc.). Right or
left hand orientation was determined at time of order. Ensure that
tower is located on the same side as the cable and tubing organizer.
b.
Before running cables, note that the cable and tubing organizer
has an adjustment feature to keep the cables lined up with the
rear of the control tower. The arm has a slide that can extend and
retract manually using the clamping knob.
WARNING:
Any procedures that require the control box to be open
should be performed with the main electrical disconnect in the locked out
position and all power sources removed from the control box. For operator
safety, secure the location of the S.U.B. outer support container
by disabling the swivel casters before servicing.
Figure 1.
Cable and Tubing Organizer
Figure 2.
Cable and Tubing
Organizer Adjustment Feature