Thermo Scientific HyPerforma S.U.B. TK Quick Start Manual Download Page 1

Thermo Scientific 

HyPerforma S.U.B. TK (Resistive)

Quick Start Guide

Summary of Contents for HyPerforma S.U.B. TK

Page 1: ...Thermo Scientific HyPerforma S U B TK Resistive Quick Start Guide...

Page 2: ...Thermo Scientific HyPerforma S U B TK Resistive Quick Start Guide Rev 1 0...

Page 3: ...ensuring availability of needed utilities power gas etc Right or left hand orientation was determined at time of order Ensure that tower is located on the same side as the cable and tubing organizer b...

Page 4: ...wer i Overlay Sparge Black ii Micro Sparge Red iii Macro Sparge White Service gas pressure should be a minimum of 30 psi and a maximum of 35 psi for proper operation Verify that gas connections are se...

Page 5: ...B TK System Position and attach various hardware items Secure the tool bracket to the tank This position is not critical but would be convenient near the motor Place the ratchet and the custom open en...

Page 6: ...e use sensors Ensure they are plugged into the back of the control tower DO 1 pH 1 Locate the bag pressure sensor cable on the Tower and route it via the cable management arm and up toward the top arm...

Page 7: ...ctor must be put in place of the UPS cable 1 3 Power Connections UPS Jumper Figure 5 UPS Jumper Ensure the S U B unit is in its intended position Lock the vessel in place by lowering the leveling feet...

Page 8: ...front of the tower is not activated should be in the out position If it is engaged then twist to disengage Note that the E stop light will remain red even though it is disengaged until the next step h...

Page 9: ...he bottom of the BPC Don t remove the protective packaging on top of the BPC at this time 3 Carefully lower the bottom end of the BPC into the S U B with any tubing sets on the top side laying over th...

Page 10: ...the sample line through the snap in slots on the drain coil arm Attach BPC positioning tabs bottom of chamber onto the alignment pins located at the base of the S U B tank Note that the 50 L BPC does...

Page 11: ...hrough the main beam of the cable and tubing organizer using the black snap in features Connect to the correct gas fitting labeled MICRO SPARGE Unclamp this lineset when ready to sparge through frit 9...

Page 12: ...or liquid 13 Position and close a bar clamp Part No SV20664 01 on the bottom drain line as close as possible to the BPC port Figure 11 Also place bar clamps on probe ports intended for conventional p...

Page 13: ...which is admin To type information without plugging a USB keyboard into the control tower click on the miniature keyboard icon located at the bottom middle of the screen This will bring up a touch scr...

Page 14: ...uration File button when first turning on the system Click the tab on the top that reads File Select the appropriate S U B TK system to be used by clicking to highlight it Thermo Turnkey 250L Electric...

Page 15: ...Thermo Scientific 13 S U B TK Resistive Quick Start Guide Quick Start Guide Figure 17 Home Monitor View...

Page 16: ...Guide Quick Start Guide 2012 Thermo Fisher Scientific Inc All rights reserved Cell Culture BioProcessing 925 West 1800 South Logan UT 84321 InAmericas Asia 435 792 8000 435 792 8001fax InEurope 32538...

Reviews: