10
Initial start up
Thermo Scientific
Smart2Pure
53
• Put in the voltage supply from the power pack into the power supply from the system on
the connection panel.
• Wait until the tank filling has been completed. This could take approx. 1.5 to 3 hours
with a Smart2Pure 3/6 system. With a Smart2Pure 12 system this could take up to 2.5
hours to fill a 30L tank and about 5 hours to fill a 60L tank. Discard the content of first
tank filling.
• Before screw in the sterile filter onto the dispensing valve outlet, wait until the tank have
the maximum capacity and leave approx 2-run 3 liters pure water from the dispensing
valve.
• Screw in the sterile filter.
• After connecting the power supply into the system, a brief self test is starting for
approx 5 minutes. After the brief self test the system begins to produce pure and
ultrapure water.
• If the tank content of the Smart2Pure 3/6 system is empty it is possible that air is
coming from the tank into the ultrafilter (only systems with ultrafilter). Thereby
you can not dispense water from the sampling tap on the system. Proceed as
follows in such a case:
• unplug the main plug and wait 5 seconds before you put the main plug
back.
• Wait approx 10-15 minutes before you start with dispensing water from
the sampling tap.
Summary of Contents for Barnstead Smart2Pure 12 UF
Page 10: ...Contents viii Smart2Pure Thermo Scientific ...
Page 14: ...1 Transport and packaging 4 Smart2Pure Thermo Scientific ...
Page 18: ...2 Safety Precautions 8 Smart2Pure Thermo Scientific ...
Page 24: ...3 Extend of delivery 14 Smart2Pure Thermo Scientific ...
Page 26: ...4 Intended Use of the device 16 Smart2Pure Thermo Scientific ...
Page 56: ...7 Installation Connections of the Smart2Pure 12 system 46 Smart2Pure Thermo Scientific ...
Page 58: ...8 Flow chart 48 Smart2Pure Thermo Scientific ...
Page 60: ...9 How the Smart2Pure system functions 50 Smart2Pure Thermo Scientific ...
Page 66: ...11 Operating Elements 56 Smart2Pure Thermo Scientific ...
Page 88: ...14 Waste disposal 78 Smart2Pure Thermo Scientific ...
Page 98: ...17 Consumables 88 Smart2Pure Thermo Scientific ...
Page 99: ...Thermo Scientific Smart2Pure 89 18 Terminal assignment ...
Page 100: ...18 Terminal assignment 90 Smart2Pure Thermo Scientific ...
Page 102: ...19 Maintenance record 92 Smart2Pure Thermo Scientific ...
Page 107: ...Thermo Scientific Smart2Pure 97 I ...
Page 108: ...Index ...