2. Insert the fixed handle into the center
hole and screw in the stud until the
tray is fastened, as shown in figure 5.
3. Fasten the screw on the tray with the
screw driver to ensure that the tray is
fixed well, as shown in figure 6.
Caution:
Failure to load or unload the tray as
listed above may result in uneven tray
rotation or possible stalling of the tray.
4. Insert the test tube into the hole. Make
sure to place the test tubes close to
the center or symmetric around the
axis.
11 Section 5 | Operation
4. Insert the test tube into the test tube
holder until it reaches the appropriate
position.
Double Tray Installation
1. Insert the stud on the rotation shaft
into the center hole of the tray and
make sure the tray firmly touchs the
fixing block of the rotary plate, as
shown in figure 4.
Note:
1. Minimum angle adjustment for Double
Tray
is 112
°
2. After continued and extended
operation, it is possible for the tray to
exhibit uneven or erratic rotation. This
does not necessarily indicate
equipment malfunction and a cause
for returning the unit to the
manufacturer.
Loading and Unloading the Tray:
1.Insert or remove culture tubes starting
from the center to the outside edge of
the tray.
2.Make sure the weight is distributed
evenly on the tray.
3.Maintain the overall balance of the
tray , especially when it is moving.
Single Tray Installation
1. Insert the screw on the rotation shaft
into the center hole of the tray and
make sure the tray firmly touchs the
fixing block of the rotary plate, as
shown in figure 1.
2. Tighten the fixed handle until the tray
is fasten, as shown in figure 2 .
3. The tip of the screw driver is aligned
with the hole at the side of the fixing
block of the rotary plate to ensure that
the fixing block of the rotary plate
does not move and continue to tighten
the fixed handle until the tray is
fastened tightly, as shown in figure 3.
figure 1
figure 2
figure 3
figure 4
figure 5
Tray,Front Facing
Digital Cel-Gro Tissue Culture Rotator 12
figure 6
Screw