1. Place the instrument on a level and firm surface; it must be capable
of supporting the weight and load of the instrument, and the impact
force generated by the motion. Prepare related parts (see Figure 1-3).
2. Install the horizontal platform on the fixed plate of the Main body;
ensure all four mounting holes on the platform and the four threaded
mounting holes are in alignment.
3. Fasten the platform and the fixed plate with four M4x10 cross recessed
countersink head screws.
4. Place the rubber mat on the platform.
Rubber Mat Platform
Installation
Figure 1-2.
Universal Platform Installation Diagram
1) Rubber mat
2) M4x10 cross recessed countersunk head screws
3) Platform
4) Main body of CO
2
resistant shaker
CO
2
Resistant Shaker
1-5
Thermo Scientific
Section 1
Unpacking and Installation
Summary of Contents for 88881101
Page 5: ...iv CO2 Resistant Shaker Thermo Scientific Table of Contents ...
Page 21: ...3 4 CO2 Resistant Shaker Thermo Scientific Section 3 Operation ...
Page 33: ...7 2 CO2 Resistant Shaker Thermo Scientific Section 7 Troubleshooting ...
Page 35: ...8 2 CO2 Resistant Shaker Thermo Scientific Section 8 Warranty Information ...