Chapter 2 Installation
2-3
STARTUP PROCEDURE
1. Connect the power cord to the rear of the unit and turn the power ON.
2. Check to make sure the power switch light is ON.
3. Monitor the indicator lights. Switch the selector switch from various positions to check
if all the LEDs are turning ON properly.
4. While moving the switch, listen for the solenoid valves to click into position and observe
that the appropriate LEDs turn ON in turn.
The Model 200L Single Dilution Probe Controller is now ready to be installed either in a
rack assembly or for test bench purposes. With the unit placed in a secured location, the
lines to the unit can be connected. Figure 2-3 illustrates a common connection to a rack
system for a Model 200L Single Dilution Probe Controller. Four major plumbing
connection lines, and the system plumbing configuration, are critical to the operation of the
controller. The four major plumbing lines are Diluted Air (DA), Diluted Sample (DS),
Vacuum Line (VL), and Calibration Line (CL).
Figure
2-3.
Typical Single Probe Controller System Line Connections
Summary of Contents for 10519
Page 4: ......
Page 8: ......
Page 9: ...vii LIST OF TABLES Table Page 4 1 Critical Orifice Sizes 4 3 5 1 Replacement Parts 5 1 ...
Page 10: ......
Page 17: ...Chapter 2 Installation 2 5 Figure 2 4 Dilution Probe ...
Page 20: ...Chapter 3 Operation 3 2 62P715 Figure 3 1 Relay Board Assembly ...
Page 30: ......
Page 36: ......
Page 41: ...B 1 APPENDIX B SCHEMATICS ...
Page 42: ...APPENDIX B SCHEMATICS B 2 ...
Page 43: ...APPENDIX B SCHEMATICS B 3 ...
Page 44: ...APPENDIX B SCHEMATICS B 4 ...