
2-1
CHAPTER 2
INSTALLATION
The installation of the Model 200L Single Dilution Probe Controller includes unpacking
the controller, connecting conditioning lines to the controller, and initial installation.
LIFTING
A procedure appropriate to lifting a heavy object should be used when lifting the
controller. This procedure consists of bending at the knees while keeping your back
straight and upright. The controller should be grasped at the bottom, in the front and at
the rear of the unit. Do not attempt to lift the controller by the cover or other external
fittings. While one person may lift the unit, it is desirable to have two persons lifting, one
by grasping the bottom in the front and the other by grasping the bottom in the rear.
UNPACKING
The Model 200L Single Dilution Probe Controller is shipped complete in one container.
If, upon receipt of the controller, there is obvious damage to the shipping container, notify
the carrier immediately and hold for inspection. The carrier, and not Thermo
Environmental Instruments Inc., is responsible for any damage incurred during shipment.
Follow the procedure below to unpack and inspect the controller.
1. Remove the controller from the shipping container and set on a table or bench that
allows easy access to both the front (Figure 2-1) and rear (Figure 2-2) of the
instrument.
2. Remove the controller cover to expose the internal components.
3. Remove any internal packing material.
4. Check for possible damage during shipment.
5. Check all connectors and printed circuit boards to see if they are firmly attached.
6. Re-install the controller cover.
Figure 2-1
. Model 200L Front Panel
Summary of Contents for 10519
Page 4: ......
Page 8: ......
Page 9: ...vii LIST OF TABLES Table Page 4 1 Critical Orifice Sizes 4 3 5 1 Replacement Parts 5 1 ...
Page 10: ......
Page 17: ...Chapter 2 Installation 2 5 Figure 2 4 Dilution Probe ...
Page 20: ...Chapter 3 Operation 3 2 62P715 Figure 3 1 Relay Board Assembly ...
Page 30: ......
Page 36: ......
Page 41: ...B 1 APPENDIX B SCHEMATICS ...
Page 42: ...APPENDIX B SCHEMATICS B 2 ...
Page 43: ...APPENDIX B SCHEMATICS B 3 ...
Page 44: ...APPENDIX B SCHEMATICS B 4 ...