![THE SHOWER LAB VIEW 23 Manual Download Page 11](http://html1.mh-extra.com/html/the-shower-lab/view-23/view-23_manual_1100496011.webp)
05/2021 V 1.0
VIEW 23
03/17
Remove the Wall Profiles and drill holes
with a 6mm high quality drill bit for a
clean and precise hole.
Fully insert the wall plugs.
Pre drill the screws in to the Wall
Profiles to create the thread to ease
later steps.
Remove screws after drilling.
Fix the Wall Profiles in place.
Take the Wall Profile Soft Seals and
push the seal into place on each Wall
Profile to cover the screws.
Ensure the fin is on the inside (wet
side).
Use the Nylon Block to help.
Using purpose built "Glass Lifters",
position and sit the Return Glass Panels
on to the Underframe Gasket and push
against the Wall Profiles.
Note the orientation and position of
the Panels, this can be determined by
any holes or attached labels.
Wet Side
Professional Tip
If drilling ceramic tiles, place
masking tape on the tiles before
marking and drill through the
tape to prevent the drill bit from
skidding.
DO NOT use Hammer Action as
this will break the tiles.
09
10
11
12